Seguir
Bruno Prata
Bruno Prata
Department of Industrial Engineering, Federal University of Ceará
Dirección de correo verificada de ufc.br
Título
Citado por
Citado por
Año
A genetic algorithm for scheduling open shops with sequence-dependent setup times
LR Abreu, JO Cunha, BA Prata, JM Framinan
Computers & Operations Research 113, 104793, 2020
1052020
Integrated optimization model for location and sizing of offshore platforms and location of oil wells
HWL Rodrigues, BA Prata, TO Bonates
Journal of Petroleum Science and Engineering 145, 734-741, 2016
652016
A branch-and-bound algorithm for optimal pump scheduling in water distribution networks
LHM Costa, B de Athayde Prata, HM Ramos, MAH de Castro
Water Resources Management 30 (3), 1037-1052, 2016
642016
Distribution of materials in road earthmoving and paving: Mathematical programming approach
RX de Lima, EFN Júnior, BA Prata, J Weissmann
Journal of construction engineering and management 139 (8), 1046-1054, 2013
602013
An integer linear programming model for the multiperiod production planning of precast concrete beams
B de Athayde Prata, AR Pitombeira-Neto, CJ de Moraes Sales
Journal of Construction Engineering and Management 141 (10), 04015029, 2015
432015
A differential evolution algorithm for the customer order scheduling problem with sequence-dependent setup times
B de Athayde Prata, CD Rodrigues, JM Framinan
Expert Systems with Applications 189, 116097, 2022
342022
Análise da eficiência dos portos da região Nordeste do Brasil baseada em Análise Envoltória de Dados
JNC Sousa Júnior, EF Nobre Júnior, BDA Prata
312008
An integer linear programming approach for pavement maintenance and rehabilitation optimization
MG Correia, T Oliveira e Bonates, ...
International Journal of Pavement Engineering, 2021
28*2021
A matheuristic algorithm for the one-dimensional cutting stock and scheduling problem with heterogeneous orders
AR Pitombeira-Neto, BA Prata
Top 28 (1), 178-192, 2020
282020
Heuristic methods for the single-machine scheduling problem with periodical resource constraints
BA Prata, LR de Abreu, JYF Lima
Top 29 (2), 524-546, 2021
272021
Customer order scheduling problem to minimize makespan with sequence-dependent setup times
B de Athayde Prata, CD Rodrigues, JM Framinan
Computers & Industrial Engineering 151, 106962, 2021
272021
Memetic Algorithm for the Heterogeneous Fleet School Bus Routing Problem
LPA Sales, CS Melo, TO Bonates, BA Prata
Journal of Urban Planning and Development 122 (2), 1-12, 2018
272018
A new variable neighbourhood search with a constraint programming search strategy for the open shop scheduling problem with operation repetitions
L Abreu, K Araújo, B Prata, M Nagano, JV Moccellin
Engineering Optimization, 2021
242021
A hybrid genetic algorithm for solving the unrelated parallel machine scheduling problem with sequence dependent setup times
LR Abreu, BA Prata
IEEE Latin America Transactions 16 (6), 1715-1722, 2018
242018
Heuristic algorithms for scheduling hybrid flow shops with machine blocking and setup times
JV Moccellin, MS Nagano, AR Pitombeira Neto, B de Athayde Prata
Journal of the Brazilian Society of Mechanical Sciences and Engineering, 2018
242018
Demand response application in industrial scenarios: A systematic mapping of practical implementation
SAB dos Santos, JM Soares, GC Barroso, B de Athayde Prata
Expert Systems with Applications 215, 119393, 2023
232023
A genetic algorithm with neighborhood search procedures for unrelated parallel machine scheduling problem with sequence-dependent setup times
LR Abreu, BA Prata
Journal of Modelling in Management 15 (3), 809-828, 2020
222020
New efficient heuristics for scheduling open shops with makespan minimization
LR Abreu, BA Prata, JM Framinan, MS Nagano
Computers & Operations Research, 2022
212022
A genetic algorithm integrated with Monte Carlo simulation for the field layout design problem
LPA Sales, AR Pitombeira-Neto, B de Athayde Prata
Oil & Gas Sciences and Technology–Revue d’IFP Energies nouvelles 73, 24, 2018
202018
A critical-path based iterated local search for the green permutation flowshop problem
V Fernandez-Viagas, B de Athayde Prata, JM Framinan
Computers & Industrial Engineering 169, 108276, 2022
192022
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20