Seguir
Radim Lenort
Radim Lenort
Škoda Auto University
Dirección de correo verificada de savs.cz
Título
Citado por
Citado por
Año
Sustainability performance assessment of industrial corporation using Fuzzy Analytic Network Process
P Wicher, F Zapletal, R Lenort
Journal of Cleaner Production 241, 118132, 2019
922019
Design of large-scale logistics systems using computer simulation hierarchic structure
M Straka, R Lenort, S Khouri, J Feliks
International Journal of Simulation Modelling 17 (1), 105-118, 2018
752018
Formation and planning of virtual production networks (VPN) in metallurgical clusters
S Saniuk, A Saniuk, R Lenort, A Samolejová
Metalurgija 53 (4), 725-727, 2014
582014
Průmyslová logistika
R Lenort
Vysoká škola Báňská, 2012
522012
Green transport balanced scorecard model with analytic network process support
D Staš, R Lenort, P Wicher, D Holman
Sustainability 7 (11), 15243-15261, 2015
472015
Principles of computer simulation design for the needs of improvement of the raw materials combined transport system.
M Straka, A Rosová, R Lenort, P Besta, J Šaderová
Acta Montanistica Slovaca 23 (2), 2018
442018
A computer simulation-based analysis of supply chains resilience in industrial environment
P Wicher, D Staš, M Karkula, R Lenort, P Besta
Metalurgija 54 (4), 703-706, 2015
402015
Analysis and identification of floating capacity bottlenecks in metallurgical production
R Lenort, A Samolejová
Metalurgija 46 (1), 61-66, 2007
402007
On influencing factors for Sustainable Development goal prioritisation in the automotive industry
R Lenort, P Wicher, F Zapletal
Journal of Cleaner Production 387, 135718, 2023
392023
The effect of harmeful elements in production of iron in relation to input and output material balance
P Besta, A Samolejová, K Janovská, R Lenort, J Haverland
Metalurgija 51 (3), 325-328, 2012
372012
The ways of creating resilient supply chains
P Wicher, R Lenort
Proceedings of CLC, 688-694, 2012
362012
Improvement of logistics in manufacturing system by the use of simulation modelling: A real industrial case study.
M Straka, S Khouri, R Lenort, P Besta
Advances in Production Engineering & Management 15 (1), 2020
332020
A3 method as a powerful tool for searching and implementing green innovations in an industrial company transport
R Lenort, D Staš, D Holman, P Wicher
Procedia engineering 192, 533-538, 2017
322017
Heuristic algorithm for planning and scheduling of forged pieces heat treatment
R Lenort, R Klepek, A Samolejová
Hrvatsko Metalurško Društvo, 2012
322012
A hybrid decision support system for iron ore supply
A Samolejová, J Feliks, R Lenort, P Besta
Metalurgija 51 (1), 91-93, 2012
302012
Comparative study of sustainable key performance indicators in metallurgical industry
R Lenort, D Staš, P Wicher, D Holman, K Ignatowicz
Rocznik Ochrona Środowiska 19, 36-51, 2017
292017
Environmental favourable foundries through maintenance activities
A Saniuk, M Jasiulewicz-Kaczmarek, A Samolejová, S Saniuk, R Lenort
Metalurgija 54 (4), 725-728, 2015
292015
Capacity planning in operations producing heavy plate cut shapes
R Lenort, D Staš, A Samolejová
Metalurgija 48 (3), 209-211, 2009
252009
Measuring the metallurgical supply chain resilience using fuzzy analytic network process
P Wicher, F Zapletal, R Lenort, D Staš
Metalurgija 55 (4), 783-786, 2016
242016
Agile versus resilient supply chains: commonalities and differences
R Lenort, P Wicher
Carpathian logistics congress, 558-564, 2012
232012
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20