Mixed-integer/linear and constraint programming approaches for activity scheduling in a nuclear research facility O Polo-Mejía, C Artigues, P Lopez, V Basini International Journal of Production Research 58 (23), 7149-7166, 2020 | 27 | 2020 |
A new RCPSP variant for scheduling research activities in a nuclear laboratory OP Mejia, MC Anselmet, C Artigues, P Lopez 47th International Conference on Computers & Industrial Engineering (CIE47), 8p., 2017 | 19 | 2017 |
Heuristic and metaheuristic methods for the multi‐skill project scheduling problem with partial preemption O Polo‐Mejía, C Artigues, P Lopez, L Mönch, V Basini International Transactions in Operational Research 30 (2), 858-891, 2023 | 13 | 2023 |
Mixed-integer and constraint programming formulations for a multi-skill project scheduling problem with partial preemption OP Mejia, MC Anselmet, C Artigues, P Lopez 12th International Conference on Modelling, Optimization and Simulation …, 2018 | 8 | 2018 |
A heuristic method for the multi-skill project scheduling problem with partial preemption OP Mejia, C Artigues, P Lopez 8th International Conference on Operations Research and Enterprise Systems …, 2019 | 5 | 2019 |
Memory and feasibility indicators in GRASP for multi-skill project scheduling with partial preemption OP Mejia, C Artigues, P Lopez, L Mönch XIII Metaheuristics International Conference (MIC 2019), 153-156, 2019 | 3 | 2019 |
Structural and experimental comparisons of formulations for a multi-skill project scheduling problem with partial preemption C Artigues, P Lopez, OP Mejía Book of Extended Abstracts, 46, 2021 | 2 | 2021 |
Multi-skill project scheduling in a nuclear research facility OP Mejia, MC Anselmet, C Artigues, P Lopez 16th International Conference on Project Management and Scheduling, 181-184, 2018 | 2 | 2018 |
Programmation linéaire en nombres entiers pour l'ordonnancement de projet multi-compétence avec préemption partielle C Artigues, P Lopez, OP Mejía 13th International Conference on Modeling, Optimization and Simulation …, 2020 | 1 | 2020 |
Mixed-Integer/Linear and Constraint Programming Approaches for a Multi-Skill Project Scheduling Problem with Partial Preemption OP Mejía, C Artigues, P Lopez EasyChair, 2020 | | 2020 |
Operational research approach for optimising the operations of a nuclear research laboratory OP Mejia Institut national des sciences appliquées de Toulouse, 2019 | | 2019 |
Algorithme glouton et recherche locale arborescente pour le MSPSP avec préemption partielle OP Mejia, C Artigues, P Lopez 20e congrès annuel de la société Française de Recherche Opérationnelle et d …, 2019 | | 2019 |
MSPSP avec préemption partielle pour l'ordonnancement des activités d'un laboratoire nucléaire OP Mejia, MC Anselmet, C Artigues, P Lopez 19e congrès annuel de la société Française de Recherche Opérationnelle et d …, 2018 | | 2018 |
HAL Id: cea-01780570 OP Mejia, MC Anselmet, C Artigues, P Lopez | | |
Implicaciones y Consideraciones para la correcta aplicación de Logísticas Colaborativas en Colombia (Revisión de literatura académica) OJP Mejía, AFP Solano | | |