Comparison among five evolutionary-based optimization algorithms E Elbeltagi, T Hegazy, D Grierson Advanced engineering informatics 19 (1), 43-53, 2005 | 1874 | 2005 |
Optimization of resource allocation and leveling using genetic algorithms T Hegazy Journal of construction engineering and management 125 (3), 167-175, 1999 | 650 | 1999 |
Neural network model for parametric cost estimation of highway projects T Hegazy, A Ayed Journal of construction engineering and management 124 (3), 210-218, 1998 | 518 | 1998 |
Optimization of construction time-cost trade-off analysis using genetic algorithms T Hegazy Canadian Journal of Civil Engineering 26 (6), 685-697, 1999 | 335 | 1999 |
Neural networks as tools in construction O Moselhi, T Hegazy, P Fazio Journal of construction engineering and management 117 (4), 606-625, 1991 | 307 | 1991 |
A modified shuffled frog-leaping optimization algorithm: applications to project management E Elbeltagi, T Hegazy, D Grierson Structure and Infrastructure Engineering 3 (1), 53-60, 2007 | 294 | 2007 |
Developing practical neural network applications using back‐propagation T Hegazy, P Fazio, O Moselhi Computer‐Aided Civil and Infrastructure Engineering 9 (2), 145-159, 1994 | 261 | 1994 |
Computer-based construction project management: Pearson new international edition T Hegazy Pearson Higher Ed, 2013 | 251 | 2013 |
Dynamic layout of construction temporary facilities considering safety E Elbeltagi, T Hegazy, A Eldosouky Journal of construction engineering and management 130 (4), 534-541, 2004 | 225 | 2004 |
Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression M Attalla, T Hegazy Journal of construction engineering and management 129 (4), 405-411, 2003 | 217 | 2003 |
Project performance control in reconstruction projects R McKim, T Hegazy, M Attalla Journal of construction engineering and management 126 (2), 137-141, 2000 | 217 | 2000 |
EvoSite: Evolution-based model for site layout planning T Hegazy, E Elbeltagi Journal of computing in civil engineering 13 (3), 198-206, 1999 | 216 | 1999 |
Cost optimization in projects with repetitive nonserial activities T Hegazy, N Wassef Journal of Construction Engineering and Management 127 (3), 183-191, 2001 | 215 | 2001 |
Comparison of two evolutionary algorithms for optimization of bridge deck repairs H Elbehairy, E Elbeltagi, T Hegazy, K Soudki Computer‐Aided Civil and Infrastructure Engineering 21 (8), 561-572, 2006 | 189 | 2006 |
Resource optimization using combined simulation and genetic algorithms T Hegazy, M Kassab Journal of construction engineering and management 129 (6), 698-705, 2003 | 183 | 2003 |
Improving design coordination for building projects. I: Information model T Hegazy, E Zaneldin, D Grierson Journal of Construction Engineering and Management 127 (4), 322-329, 2001 | 156 | 2001 |
DBID: analogy-based DSS for bidding in construction O Moselhi, T Hegazy, P Fazio Journal of Construction Engineering and Management 119 (3), 466-479, 1993 | 151 | 1993 |
Analogy-based solution to markup estimation problem T Hegazy, O Moselhi Journal of Computing in Civil Engineering 8 (1), 72-87, 1994 | 145 | 1994 |
Conflict resolution in construction disputes using the graph model M Kassab, K Hipel, T Hegazy Journal of construction engineering and management 132 (10), 1043-1052, 2006 | 130 | 2006 |
Daily windows delay analysis T Hegazy, K Zhang Journal of construction engineering and management 131 (5), 505-512, 2005 | 128 | 2005 |