Evaluasi waste dan implementasi lean construction (studi kasus: Proyek pembangunan gedung serbaguna taruna politeknik ilmu pelayaran semarang) AC Mudzakir, A Setiawan, MA Wibowo, RR Khasani Jurnal Karya Teknik Sipil 6 (2), 145-158, 2017 | 53 | 2017 |
Analisa perbandingan penggunaan bekisting konvensional, semi sistem, dan sistem (PERI) pada kolom gedung bertingkat HS Pratama, RK Anggraeni, A Hidayat, RR Khasani Jurnal Karya Teknik Sipil 6 (1), 303-313, 2017 | 51 | 2017 |
Predicting nominal shear capacity of reinforced concrete wall in building by metaheuristics-optimized machine learning JS Chou, CY Liu, H Prayogo, RR Khasani, D Gho, GG Lalitan Journal of Building Engineering 61, 105046, 2022 | 30 | 2022 |
Effect of Building Information Modeling (BIM) on reduced construction time-costs: a case study MN Sholeh, S Fauziyah, RR Khasani E3S Web of Conferences 202, 02012, 2020 | 25 | 2020 |
Image quality enhancement using HybridGAN for automated railway track defect recognition MY Cheng, RR Khasani, K Setiono Automation in Construction 146, 104669, 2023 | 20 | 2023 |
Mapping delay risks of EPC projects: a case study of a platform and subsea pipeline of an oil and gas project JUD Hatmoko, RR Khasani IOP Conference Series: Materials Science and Engineering 598 (1), 012095, 2019 | 16 | 2019 |
Evaluasi kepuasan pelanggan terhadap kinerja manajemen proyek kontraktor besar bangunan gedung RK Radian Tesis Program Pascasarjana, Universitas Diponerogo, Semarang, 2013 | 14 | 2013 |
Edukasi Building Information Modeling (BIM) Pada Kontraktor Kecil JUD Hatmoko, MA Wibowo, F Kristiani, RR Khasani, R Fatmawati, ... Jurnal Pasopati 2 (3), 2020 | 12 | 2020 |
Analisis Risiko Investasi Proyek Kereta Cepat Jakarta-Bandung D Marantika, MB Erwinsyah, JUD Hatmoko, RR Khasani Jurnal Karya Teknik Sipil 6 (1), 324-335, 2017 | 11 | 2017 |
Assessment of bim in high-rise building construction in Indonesia RR Khasani, A Hidayat Int. J. Sci. Technol. Res 7 (7), 112-117, 2018 | 9 | 2018 |
Comparing performance of government and private clients in construction projects: Contractors’ perspective JUD Hatmoko, RR Khasania Civil Engineering Dimension 18 (2), 85-92, 2016 | 9 | 2016 |
Image-based preliminary emergency assessment of damaged buildings after earthquake: Taiwan case studies MY Cheng, RR Khasani, RJ Citra Engineering Applications of Artificial Intelligence 126, 107164, 2023 | 8 | 2023 |
Pengaruh pola kebijakan produktivitas konstruksi Indonesia terhadap daya saing infrastruktur FS Tarigan, DOS Hutagalung, F Hermawan, RR Khasani Jurnal Karya Teknik Sipil 6 (4), 201-213, 2017 | 7 | 2017 |
Assessing Contractor Satisfaction towards Client Performance in Construction Projects J Utomo Dwi Hatmoko, R Radian Khasani Applied Mechanics and Materials 845, 338-343, 2016 | 6 | 2016 |
Pembuatan Sumur Resapan Sebagai Upaya Peningkatan Cadangan Air Tanah dan Pengendalian Banjir di Kecamatan Tembalang JUD Hatmoko, MA Wibowo, A Hidayat, RR Khasani, F Hermawan, ... Jurnal Pasopati 3 (1), 2021 | 5 | 2021 |
Assessing company readiness level towards the implementation of building information modelling (BIM) in Indonesia JUD Hatmoko, F Kistiani, RR Khasani Malaysian Constr. Res. J 29, 95-108, 2019 | 5 | 2019 |
Rizki Fatmawati, & Sihaloho, GD (2020) JUD Hatmoko, MA Wibowo, F Kristiani, RR Khasani, F Hermawan Building Information Modeling (BIM) Education for Small Contractors …, 0 | 4 | |
Quantitative risk analysis for oil and gas projects: A case study JUD Hatmoko, RR Khasani IOP Conference Series: Earth and Environmental Science 448 (1), 012073, 2020 | 3 | 2020 |
Evaluasi Kepuasan Pelanggan Terhadap Kinerja Management Proyek Kontraktor Besar Bangunan Gedung R Radian Khasani Tesis Universitas Diponegoro, 2013 | 3 | 2013 |
An innovative moment balanced inference engine for predicting recycled concrete aggregate strength and minimizing mixture CO2 emissions MY Cheng, RR Khasani Construction and Building Materials 441, 137482, 2024 | 1 | 2024 |