Suivre
Amin Hammad
Amin Hammad
Professor at CIISE, Concordia University
Adresse e-mail validée de ciise.concordia.ca - Page d'accueil
Titre
Citée par
Citée par
Année
Knowledge-assisted BIM-based visual analytics for failure root cause detection in facilities management
A Motamedi, A Hammad, Y Asen
Automation in construction 43, 73-83, 2014
3522014
Simulation-based multi-objective optimization of institutional building renovation considering energy consumption, life-cycle cost and life-cycle assessment
SA Sharif, A Hammad
Journal of Building Engineering 21, 429-445, 2019
2132019
Automated code compliance checking for building envelope design
X Tan, A Hammad, P Fazio
Journal of Computing in Civil Engineering 24 (2), 203-211, 2010
2072010
LiDAR-equipped UAV path planning considering potential locations of defects for bridge inspection
N Bolourian, A Hammad
Automation in Construction 117, 103250, 2020
1982020
Automated excavators activity recognition and productivity analysis from construction site surveillance videos
C Chen, Z Zhu, A Hammad
Automation in construction 110, 103045, 2020
1892020
Remote interactive collaboration in facilities management using BIM-based mixed reality
K El Ammari, A Hammad
Automation in Construction 107, 102940, 2019
1672019
Lifecycle management of facilities components using radio frequency identification and building information model
A Motamedi, A Hammad
Journal of Information Technology in Construction (ITCON) 14 (18), 238-262, 2009
1552009
Developing surrogate ANN for selecting near-optimal building energy renovation methods considering energy consumption, LCC and LCA
SA Sharif, A Hammad
Journal of Building Engineering 25, 100790, 2019
1502019
Critical review and research roadmap of office building energy management based on occupancy monitoring
S Salimi, A Hammad
Energy and Buildings 182, 214-241, 2019
1462019
Predicting movements of onsite workers and mobile equipment for enhancing construction site safety
Z Zhu, MW Park, C Koch, M Soltani, A Hammad, K Davari
Automation in Construction 68, 95-101, 2016
1462016
Improving lifting motion planning and re-planning of cranes with consideration for safety and efficiency
C Zhang, A Hammad
Advanced Engineering Informatics 26 (2), 396-410, 2012
1412012
Multiobjective optimization of bridge deck rehabilitation using a genetic algorithm
C Liu, A Hammad, Y Itoh
Computer‐Aided Civil and Infrastructure Engineering 12 (6), 431-443, 1997
1351997
Crane pose estimation using UWB real-time location system
C Zhang, A Hammad, S Rodriguez
Journal of Computing in Civil Engineering 26 (5), 625-637, 2012
1332012
Maintenance strategy optimization of bridge decks using genetic algorithm
C Liu, A Hammad, Y Itoh
Journal of transportation engineering 123 (2), 91-100, 1997
1241997
Optimization-based excavator pose estimation using real-time location systems
F Vahdatikhaki, A Hammad, H Siddiqui
Automation in Construction 56, 76-92, 2015
1222015
Framework for near real-time simulation of earthmoving projects using location tracking technologies
F Vahdatikhaki, A Hammad
Automation in Construction 42, 50-67, 2014
1192014
Skeleton estimation of excavator by detecting its parts
MM Soltani, Z Zhu, A Hammad
Automation in Construction 82, 1-15, 2017
1122017
Localization of RFID-equipped assets during the operation phase of facilities
A Motamedi, MM Soltani, A Hammad
Advanced Engineering Informatics 27 (4), 566-579, 2013
1122013
Automated annotation for visual recognition of construction resources using synthetic images
MM Soltani, Z Zhu, A Hammad
Automation in Construction 62, 14-23, 2016
1062016
History and recent development of multi-purpose utility tunnels
Y Luo, A Alaghbandrad, TK Genger, A Hammad
Tunnelling and Underground Space Technology 103, 103511, 2020
1012020
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20