A survey on offline scheduling with rejection D Shabtay, N Gaspar, M Kaspi Journal of scheduling 16, 3-28, 2013 | 247 | 2013 |
Optimal flow path design of unidirectional AGV systems M Kaspi, JMA Tanchoco The International Journal of Production Research 28 (6), 1023-1030, 1990 | 225 | 1990 |
On the economic ordering quantity for jointly replenished items M Kaspi, MJ Rosenblatt The International Journal of Production Research 29 (1), 107-114, 1991 | 175 | 1991 |
An improvement of Silver's algorithm for the joint replenishment problem M Kaspi, MJ Rosenblatt AIIE Transactions 15 (3), 264-267, 1983 | 155 | 1983 |
Minimizing the total weighted flow time in a single machine with controllable processing times D Shabtay, M Kaspi Computers & Operations Research 31 (13), 2279-2289, 2004 | 105 | 2004 |
Parallel machine scheduling with a convex resource consumption function D Shabtay, M Kaspi European Journal of Operational Research 173 (1), 92-107, 2006 | 91 | 2006 |
Optimal solution for the flow path design problem of a balanced unidirectional AGV system M Kaspi, U Kesselman, JMA Tanchoco International Journal of Production Research 40 (2), 389-401, 2002 | 66 | 2002 |
Setting expediting repair policy in a multi-echelon repairable-item inventory system with limited repair capacity Y Perlman, A Mehrez, M Kaspi Journal of the Operational Research Society 52 (2), 198-209, 2001 | 55 | 2001 |
The effectiveness of heuristic algorithms for multi-item inventory systems with joint replenishment costs M Kaspi, MJ Rosenblatt International Journal of Production Research 23 (1), 109-116, 1985 | 55 | 1985 |
Location and sequencing of imperfect inspection operations in serial multi-stage production systems T Raz, M Kaspi THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 29 (8), 1645-1659, 1991 | 50 | 1991 |
Convex resource allocation for minimizing the makespan in a single machine with job release dates M Kaspi, D Shabtay Computers & Operations Research 31 (9), 1481-1489, 2004 | 45 | 2004 |
A bicriterion approach to time/cost trade-offs in scheduling with convex resource-dependent job processing times and release dates M Kaspi, D Shabtay Computers & Operations Research 33 (10), 3015-3033, 2006 | 42 | 2006 |
The no-wait two-machine flow shop scheduling problem with convex resource-dependent processing times D Shabtay, M Kaspi, G Steiner Iie Transactions 39 (5), 539-557, 2007 | 38 | 2007 |
Optimization of the machining economics problem for a multistage transfer machine under failure, opportunistic and integrated replacement strategies M Kaspi, D Shabtay International journal of production research 41 (10), 2229-2247, 2003 | 38 | 2003 |
A bicriteria approach to maximize the weighted number of just-in-time jobs and to minimize the total resource consumption cost in a two-machine flow-shop scheduling system D Shabtay, Y Bensoussan, M Kaspi International Journal of Production Economics 136 (1), 67-74, 2012 | 33 | 2012 |
Note—A Dynamic Programming Algorithm for Joint Replenishment Under General Order Cost Functions MJ Rosenblatt, M Kaspi Management Science 31 (3), 369-373, 1985 | 30 | 1985 |
Optimization of the machining economics problem under the failure replacement strategy D Shabtay, M Kaspi International Journal of Production Economics 80 (3), 213-230, 2002 | 29 | 2002 |
On the Scheduling of Identical Parallel Processes with Arbitrary Initial Precessor Available Times M Kaspi, B Montreuil School of Industrial Engineering, Purdue University, 1988 | 29 | 1988 |
A bicriteria approach to minimize maximal lateness and resource consumption for scheduling a single machine L Yedidsion, D Shabtay, M Kaspi Journal of Scheduling 10, 341-352, 2007 | 26 | 2007 |
A survey on scheduling problems with rejection D Shabtay, N Gasper, M Kaspi Journal of Scheduling 16 (1), 3-28, 2013 | 16 | 2013 |