Suivre
Vahid Baradaran
Vahid Baradaran
Associate Professor, Islamic Azad University, North Tehran Branch
Adresse e-mail validée de iau-tnb.ac.ir - Page d'accueil
Titre
Citée par
Citée par
Année
Stochastic vehicle routing problem with heterogeneous vehicles and multiple prioritized time windows: Mathematical modeling and solution approach
V Baradaran, A Shafaei, AH Hosseinian
Computers & Industrial Engineering 131, 187-199, 2019
772019
A healthcare logistic network considering stochastic emission of contamination: Bi-objective model and solution algorithm
M Nikzamir, V Baradaran
Transportation Research Part E: Logistics and Transportation Review 142, 102060, 2020
552020
Accurate estimation of average waiting time in public transportation systems
MR Amin-Naseri, V Baradaran
Transportation Science 49 (2), 213-222, 2015
472015
Modeling of the time-dependent multi-skilled RCPSP considering learning effect: An evolutionary solution approach
AH Hosseinian, V Baradaran, M Bashiri
Journal of Modelling in Management 14 (2), 521-558, 2019
392019
P-GWO and MOFA: two new algorithms for the MSRCPSP with the deterioration effect and financial constraints (case study of a gas treating company)
AH Hosseinian, V Baradaran
Applied Intelligence 50 (7), 2151-2176, 2020
302020
Development of fuzzy exploratory factor Analysis for designing an E-learning service quality assessment model
V Baradaran, E Ghorbani
International Journal of Fuzzy Systems 22 (6), 1772-1785, 2020
282020
DESIGNING A LOGISTIC NETWORK FOR HOSPITAL WASTE MANAGEMENT: A BENDERS DECOMPOSITION ALGORITHM
YP Mohammad Nikzamir, Vahid Baradaran
Environmental Engineering and Management Journal 19 (11), 1937-1956, 2020
24*2020
An evolutionary algorithm based on a hybrid multi-attribute decision making method for the multi-mode multi-skilled resource-constrained project scheduling problem
AH Hosseinian, V Baradaran
Journal of Optimization in Industrial Engineering 12 (2), 155-178, 2019
232019
A Robust Algorithm for Classification and Diagnosis of Brain Disease Using Local Linear Approximation and Generalized Autoregressive Conditional Heteroscedasticity Model
VBAM Ali Hamzenejad, Saeid Jafarzadeh Ghoushchi
Mathematics 8 (8), 1-19, 2020
21*2020
Activity Level as a Link between Customer Retention and Customer Lifetime Value
N Abdolvand
Iranian Journal of Management Studies, 2015
212015
A two-phase approach for solving the multi-skill resource-constrained multi-project scheduling problem: a case study in construction industry
AH Hosseinian, V Baradaran
Engineering, Construction and Architectural Management 30 (1), 321-363, 2023
202023
Detecting communities of workforces for the multi-skill resource-constrained project scheduling problem: A dandelion solution approach
AH Hosseinian, V Baradaran
Journal of Industrial and Systems Engineering 12 (Special issue on Project …, 2019
202019
Assessment and prioritizing the risks of urban rail transportation by using grey analytical hierarchy process (GAHP)
V Baradaran
International Journal of Transportation Engineering 4 (4), 255-273, 2017
182017
Planning a model for supplier selection with AHP and Grey systems theory
YN Mohammad, B Vahid, A Majid
Business and Management Review 1 (7), 09-19, 2011
182011
A multi-objective multi-agent optimization algorithm for the multi-skill resource-constrained project scheduling problem with transfer times
AH Hosseinian, V Baradaran
RAIRO-operations Research 55 (4), 2093-2128, 2021
172021
[Retracted] Clustering of Brain Tumor Based on Analysis of MRI Images Using Robust Principal Component Analysis (ROBPCA) Algorithm
A Hamzenejad, SJ Ghoushchi, V Baradaran
BioMed Research International 2021 (1), 5516819, 2021
172021
A model for evaluation and development of citizens' electronic readiness for deployment of an E-city using structural equation modeling
V Baradaran, S Farokhi, Z Ahamdi
Journal of Global Information Management (JGIM) 26 (4), 135-157, 2018
172018
A hybrid of Delphi, AHP and TOPSIS Methods for project portfolio management
A Borjy, V Baradaran, P Zandi, M Taheri
Journal of Project Management 4 (2), 141-156, 2019
152019
Modified Pareto archived evolution strategy for the multi-skill project scheduling problem with generalized precedence relations
AH Hosseinian, V Bardaran
Journal of Industrial Engineering and Management Studies 7 (1), 59-86, 2020
142020
An energy-efficient mathematical model for the resource-constrained project scheduling problem: an evolutionary algorithm
AH Hosseinian, V Baradaran
Interdisciplinary Journal of Management Studies (Formerly known as Iranian …, 2019
142019
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20