Suivre
Edward Ayebeng Botchway
Titre
Citée par
Citée par
Année
A critical success model for PPP public housing delivery in Ghana
TE Kwofie, S Afram, E Botchway
Built Environment Project and Asset Management 6 (1), 58-73, 2016
1252016
Factors contributing towards the effectiveness of construction project teams
TE Kwofie, A Alhassan, E Botchway, I Afranie
International Journal of Construction Management 15 (2), 170-178, 2015
562015
Historical overview of housing provision in pre and post-independence Ghana
TE Kwofie, E Adinyira, E Botchway
The West Africa Built Environment Research (WABER) Conference, 541-557, 2011
492011
Determining critical project success criteria for public housing building projects (PHBPS) in Ghana
E Adinyira, E Botchway, TE Kwofie
Engineering Management Research 1 (2), 122-132, 2012
412012
Building permit acquisition in Ghana: The situation in Kumasi
EA Botchway, SO Afram, J Ankrah
Developing Country Studies 4 (20), 11-22, 2014
302014
The impact of Computer Aided Architectural Design tools on architectural design education. The case of KNUST
EA Botchway, S Amos-Abanyie, SO Afram
Architectural Engineering Technology 4 (2), 2015
272015
Exploring the current technologies essential for health and safety in the Ghanaian construction industry
K Agyekum, H Pittri, EA Botchway, J Amudjie, VMA Kumah, ...
Merits 2 (4), 314-330, 2022
222022
Identification of the critical project management competencies of architects in the Ghanaian construction industry
TE Kwofie, E Adinyira, EA Botchway
International Journal of Construction Management 15 (4), 288-298, 2015
212015
Design for deconstruction (DfD) implementation among design professionals: empirical evidence from Ghana
H Pittri, K Agyekum, E Ayebeng Botchway, A Opoku, I Bimpli
International journal of construction management 24 (13), 1387-1397, 2024
202024
Competencies Driving Waste Minimization during the Construction Phase of Buildings
BE Ayebeng, SS Asare, ...
Buildings 13 (4), 971, 2023
18*2023
Examining the Performance Level of Project Management Competencies of Architects in Ghana Using Gap Analysis Approach
TE Kwofie, EA Botchway, S Amos-Abanyie
Journal of Construction in Developing Countries 23 (1), 125-147, 2018
182018
The relationship between level of architect’s professional competencies and client satisfaction level
S Amos-Abanyie, EA Botchway, TE Kwofie
Engineering Management Research 3 (2), 10-19, 2014
172014
Examining built environment professionals′ willingness to pay for green buildings in Ghana
VMA Kumah, K Agyekum, EA Botchway, H Pittri, FO Danso
Buildings 12 (12), 2097, 2022
162022
Benefits of e-governance implementation in physical infrastructure development at the local government level
EA Botchway, EO Yeboah-Boateng, TE Kwofie
Electronic Government, An International Journal 12 (4), 395-405, 2016
122016
Prioritizing the principles of circular economy among built environment professionals
K Agyekum, J Amudjie, H Pittri, A Morkporkpor Ami Dompey, ...
Built Environment Project and Asset Management, Pages 1-17, 2023
92023
Implementing the principles of circular economy in the construction industry: exploratory and confirmatory factor analyses of strategies
J Amudjie, K Agyekum, E Adinyira, S Amos-Abanyie, EA Botchway
Construction Innovation, 2023
92023
Investigating the Underlining Factors of Critical Project Success Criteria for Public Housing Delivery in Ghana
TEK E. Adinyira, E.A. Botchway
J. Wang et al. (eds.), Proceedings of the 17th International Symposium on …, 2014
9*2014
Drivers for design for deconstruction (DfD) implementation among design professionals
H Pittri, K Agyekum, EA Botchway, J Alencastro, OT Oladinrin, ...
Smart and Sustainable Built Environment 13 (5), 1134-1154, 2024
82024
Investigating the low utilization of pozzolana cement in the Ghanaian construction industry
MA Botchway Ayebeng Edward
International Journal of Civil Engineering and Technology 10 (6), 475-482, 2019
72019
Achieving Healthy City Development in Ghana: Referencing Sustainable Development Goal 11
E Ayebeng Botchway, K Agyekum, N Jenefailus, H Pittri, ...
Sustainability 15 (19), 14361, 2023
62023
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20