Suivre
LONG LE-HOAI
LONG LE-HOAI
Vietnam National University Ho Chi Minh City, Ho Chi Minh City University of Technology
Adresse e-mail validée de hcmut.edu.vn
Titre
Citée par
Citée par
Année
Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries
L Le-Hoai, YD Lee, JY Lee
KSCE journal of civil engineering 12, 367-377, 2008
9082008
Quantifying the complexity of transportation projects using the fuzzy analytic hierarchy process
AT Nguyen, LD Nguyen, L Le-Hoai, CN Dang
International journal of project management 33 (6), 1364-1376, 2015
1982015
Effect of project complexity on cost and schedule performance in transportation projects
LD Nguyen, L Le-Hoai, DQ Tran, CN Dang, CV Nguyen
Construction Management and Economics 37 (7), 384-399, 2019
732019
Impact of knowledge enabling factors on organizational effectiveness in construction companies
CN Dang, L Le-Hoai, SY Kim
Journal of Knowledge Management 22 (4), 759-780, 2018
632018
Estimating time performance for building construction projects in Vietnam
L Le-Hoai, Y Dai Lee, AT Nguyen
KSCE Journal of Civil Engineering 17 (1), 1-8, 2013
522013
Tradeoff time cost quality in repetitive construction project using fuzzy logic approach and symbiotic organism search algorithm
DT Nguyen, L Le-Hoai, PB Tarigan, DH Tran
Alexandria Engineering Journal 61 (2), 1499-1518, 2022
512022
Partnering in construction: Investigation of problematic issues for implementation in Vietnam
L Le-Hoai, Y Dai Lee, JJ Son
KSCE Journal of Civil Engineering 14 (5), 731-741, 2010
412010
Time‐cost relationships of building construction project in Korea
L Le‐Hoai, Y Dai Lee
Facilities 27 (13/14), 549-559, 2009
402009
Critical success factors for implementation process of design-build projects in Vietnam
CN Dang, L Le-Hoai
Journal of Engineering, Design and Technology 14 (1), 17-32, 2016
392016
Relating knowledge creation factors to construction organizations’ effectiveness: Empirical study
CN Dang, L Le-Hoai
Journal of Engineering, Design and Technology 17 (3), 515-536, 2019
322019
Identification of risk patterns in Vietnamese road and bridge construction: Contractor’s perspective
CN Dang, L Le-Hoai, SY Kim, CV Nguyen, YD Lee, SH Lee
Built Environment Project and Asset Management 7 (1), 59-72, 2017
302017
Influence of participants’ characteristics on sustainable building practices in emerging economies: Empirical case study
HD Nguyen, LD Nguyen, YY Chih, L Le-Hoai
Journal of Construction Engineering and Management 143 (8), 05017014, 2017
292017
Proposing a strategy map for coastal urban project success using the balanced scorecard method
TTM Huynh, CN Dang, L Le-Hoai, AD Pham, TD Nguyen
Engineering, Construction and Architectural Management 27 (10), 2993-3030, 2020
282020
Construction of time-cost model for building projects in Vietnam
LH Long, YD Lee, JW Cho
Korean Journal of Construction Engineering and Management 10 (3), 130-138, 2009
232009
Fuzzy AHP with applications in evaluating construction project complexity
LD Nguyen, L Le-Hoai, DQ Tran, CN Dang, CV Nguyen
Fuzzy hybrid computing in construction engineering and management: Theory …, 2018
192018
Revisiting storey enclosure method for early estimation of structural building construction cost
CN Dang, L Le-Hoai
Engineering, construction and architectural management 25 (7), 877-895, 2018
192018
Linking knowledge enabling factors to organizational performance: Empirical study of project-based firms
CN Dang, L Le-Hoai, V Peansupap
International Journal of Construction Management 22 (3), 527-540, 2022
182022
Benchmarking claim causes against contractors in emerging markets: empirical case study
L Le-Hoai, CN Dang, SB Lee, YD Lee
International Journal of Construction Management 19 (4), 307-316, 2019
182019
Building a strategic performance management model for enterprises investing to coastal urban projects toward sustainability
TTM Huynh, AD Pham, L Le-Hoai
International Journal of Strategic Property Management 25 (2), 127-145, 2021
172021
Project-based A/E/C firms’ knowledge management capability and market development performance: Does firm size matter
CN Dang, YY Chih, L Le-Hoai, LD Nguyen
Journal of Construction Engineering and Management 146 (11), 04020127, 2020
162020
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20