Circular economy and the construction industry: Existing trends, challenges and prospective framework for sustainable construction MU Hossain, ST Ng, P Antwi-Afari, B Amor Renewable and sustainable energy reviews 130, 109948, 2020 | 579 | 2020 |
Prefabricated construction enabled by the Internet-of-Things RY Zhong, Y Peng, F Xue, J Fang, W Zou, H Luo, ST Ng, W Lu, GQP Shen, ... Automation in Construction 76, 59-70, 2017 | 446 | 2017 |
Behavioral aspects in construction partnering SO Cheung, TST Ng, SP Wong, HCH Suen International journal of project management 21 (5), 333-343, 2003 | 387 | 2003 |
Applying a genetic algorithm-based multiobjective approach for time-cost optimization DXM Zheng, ST Ng, MM Kumaraswamy Journal of Construction Engineering and management 130 (2), 168-176, 2004 | 360 | 2004 |
Problematic issues associated with project partnering—The contractor perspective ST Ng, TM Rose, M Mak, SE Chen International journal of project management 20 (6), 437-449, 2002 | 354 | 2002 |
Evaluating stakeholder satisfaction during public participation in major infrastructure and construction projects: A fuzzy approach THY Li, ST Ng, M Skitmore Automation in construction 29, 123-135, 2013 | 318 | 2013 |
Sustainability appraisal in infrastructure projects (SUSAIP): Part 1. Development of indicators and computational methods OO Ugwu, MM Kumaraswamy, A Wong, ST Ng Automation in construction 15 (2), 239-251, 2006 | 317 | 2006 |
Factors influencing the success of PPP at feasibility stage–A tripartite comparison study in Hong Kong ST Ng, YMW Wong, JMW Wong Habitat international 36 (4), 423-432, 2012 | 311 | 2012 |
A framework for evaluating the safety performance of construction contractors ST Ng, KP Cheng, RM Skitmore Building and environment 40 (10), 1347-1355, 2005 | 309 | 2005 |
A global metagenomic map of urban microbiomes and antimicrobial resistance D Danko, D Bezdan, EE Afshin, S Ahsanuddin, C Bhattacharya, DJ Butler, ... Cell 184 (13), 3376-3393. e17, 2021 | 276 | 2021 |
Reducing building life cycle carbon emissions through prefabrication: Evidence from and gaps in empirical studies Y Teng, K Li, W Pan, T Ng Building and Environment 132, 125-136, 2018 | 256 | 2018 |
Conflict or consensus: An investigation of stakeholder concerns during the participation process of major infrastructure and construction projects in Hong Kong THY Li, ST Ng, M Skitmore Habitat international 36 (2), 333-342, 2012 | 230 | 2012 |
The art and science of Feng Shui—a study on architects’ perception MY Mak, ST Ng Building and Environment 40 (3), 427-434, 2005 | 225 | 2005 |
Critical consideration of buildings' environmental impact assessment towards adoption of circular economy: An analytical review MU Hossain, ST Ng Journal of Cleaner Production 205, 763-780, 2018 | 218 | 2018 |
River flow time series prediction with a range-dependent neural network TS Hu, KC Lam, ST Ng Hydrological Sciences Journal 46 (5), 729-745, 2001 | 213 | 2001 |
Comparing the midpoint and endpoint approaches based on ReCiPe—a study of commercial buildings in Hong Kong YH Dong, ST Ng The International Journal of Life Cycle Assessment 19, 1409-1423, 2014 | 212 | 2014 |
Demotivating factors influencing the productivity of civil engineering projects ST Ng, RM Skitmore, KC Lam, AWC Poon International journal of project Management 22 (2), 139-146, 2004 | 211 | 2004 |
A simulation model for optimizing the concession period of public–private partnerships schemes ST Ng, J Xie, YK Cheung, M Jefferies International journal of project management 25 (8), 791-798, 2007 | 209 | 2007 |
Forecast models for actual construction time and cost RM Skitmore, ST Ng Building and environment 38 (8), 1075-1083, 2003 | 206 | 2003 |
Public participation in infrastructure and construction projects in China: From an EIA-based to a whole-cycle process THY Li, ST Ng, M Skitmore Habitat international 36 (1), 47-56, 2012 | 202 | 2012 |