Prati
Hosein Taghaddos
Hosein Taghaddos
Associate Professor, School of Civil Engineering, College of Engineering, University of Tehran
Potvrđena adresa e-pošte na ut.ac.ir - Početna stranica
Naslov
Citirano
Citirano
Godina
Prediction of long-term chloride diffusion in silica fume concrete in a marine environment
A Farahani, H Taghaddos, M Shekarchi
Cement and Concrete Composites 59, 10-17, 2015
2182015
Simulation-based multiagent approach for scheduling modular construction
H Taghaddos, U Hermann, S AbouRizk, Y Mohamed
Journal of Computing in Civil Engineering 28 (2), 263-274, 2014
1332014
A methodology for mobile crane lift path checking in heavy industrial projects
Z Lei, H Taghaddos, U Hermann, M Al-Hussein
Automation in Construction 31, 41-53, 2013
1032013
Automated crane planning and optimization for modular construction
H Taghaddos, U Hermann, AB Abbasi
Automation in construction 95, 219-232, 2018
922018
BIM-based 4D mobile crane simulation and onsite operation management
AN Tak, H Taghaddos, A Mousaei, A Bolourani, U Hermann
Automation in Construction 128, 103766, 2021
722021
Automated method for checking crane paths for heavy lifts in industrial projects
Z Lei, H Taghaddos, J Olearczyk, M Al-Hussein, U Hermann
Journal of Construction Engineering and Management 139 (10), 04013011, 2013
712013
Utilization of semantic web technologies to improve BIM-LCA applications
S Sobhkhiz, H Taghaddos, M Rezvani, AM Ramezanianpour
Automation in Construction 130, 103842, 2021
672021
Integrating discrete event simulation and genetic algorithm optimization for bridge maintenance planning
MH Nili, H Taghaddos, B Zahraie
Automation in Construction 122, 103513, 2021
552021
Heavy mobile crane lift path planning in congested modular industrial plants using a robotics approach
N Kayhani, H Taghaddos, A Mousaei, S Behzadipour, U Hermann
Automation in Construction 122, 103508, 2021
552021
Algorithm for mobile crane walking path planning in congested industrial plants
Z Lei, SH Han, A Bouferguène, H Taghaddos, U Hermann, M Al-Hussein
Journal of Construction Engineering and Management 141 (2), 05014016, 2015
542015
Evaluating mobile crane lift operations using an interactive virtual reality system
S Pooladvand, H Taghaddos, A Eslami, A Nekouvaght Tak, U Hermann
Journal of Construction Engineering and Management 147 (11), 04021154, 2021
532021
Integrated BIM-based simulation for automated time-space conflict management in construction projects
MS Dashti, M RezaZadeh, M Khanzadi, H Taghaddos
Automation in Construction 132, 103957, 2021
492021
An A-Star algorithm for semi-optimization of crane location and configuration in modular construction
SM Bagheri, H Taghaddos, A Mousaei, F Shahnavaz, U Hermann
Automation in Construction 121, 103447, 2021
462021
Evaluating industrial modularization strategies: Local vs. overseas fabrication
AN Tak, H Taghaddos, A Mousaei, UR Hermann
Automation in construction 114, 103175, 2020
462020
Simulation-based auction protocol for resource scheduling problems
H Taghaddos, S AbouRizk, Y Mohamed, U Hermann
Journal of construction engineering and management 138 (1), 31-42, 2012
452012
BIM-augmented reality integrated approach to risk management
S Alirezaei, H Taghaddos, K Ghorab, AN Tak, S Alirezaei
Automation in Construction 141, 104458, 2022
432022
The influence of craft workers’ educational attainment and experience level in fatal injuries prevention in construction projects
H Karimi, H Taghaddos
Safety science 117, 417-427, 2019
392019
From AutoCAD to 3ds Max: An automated approach for animating heavy lifting studies
Z Lei, H Taghaddos, SH Han, A Bouferguène, M Al-Hussein, U Hermann
Canadian Journal of Civil Engineering 42 (3), 190-198, 2015
392015
Improving emergency training for earthquakes through immersive virtual environments and anxiety tests: A case study
MS Rajabi, H Taghaddos, SM Zahrai
Buildings 12 (11), 1850, 2022
382022
An integrated framework for operation and maintenance of gas utility pipeline using BIM, GIS, and AR
A Shekargoftar, H Taghaddos, A Azodi, A Nekouvaght Tak, K Ghorab
Journal of Performance of Constructed Facilities 36 (3), 04022023, 2022
372022
Sustav trenutno ne može provesti ovu radnju. Pokušajte ponovo kasnije.
Članci 1–20