Prati
Ali Mousaei
Ali Mousaei
Nepoznata afilijacija
Potvrđena adresa e-pošte na ut.ac.ir
Naslov
Citirano
Citirano
Godina
BIM-based 4D mobile crane simulation and onsite operation management
AN Tak, H Taghaddos, A Mousaei, A Bolourani, U Hermann
Automation in Construction 128, 103766, 2021
722021
Heavy mobile crane lift path planning in congested modular industrial plants using a robotics approach
N Kayhani, H Taghaddos, A Mousaei, S Behzadipour, U Hermann
Automation in Construction 122, 103508, 2021
552021
An A-Star algorithm for semi-optimization of crane location and configuration in modular construction
SM Bagheri, H Taghaddos, A Mousaei, F Shahnavaz, U Hermann
Automation in Construction 121, 103447, 2021
462021
Evaluating industrial modularization strategies: Local vs. overseas fabrication
AN Tak, H Taghaddos, A Mousaei, UR Hermann
Automation in construction 114, 103175, 2020
462020
Optimized mobile crane path planning in discretized polar space
A Mousaei, H Taghaddos, A Nekouvaght Tak, S Behzadipour, U Hermann
Journal of Construction Engineering and Management 147 (5), 04021036, 2021
312021
Optimizing heavy lift plans for industrial construction sites using Dijkstra’s algorithm
A Mousaei, H Taghaddos, S Marzieh Bagheri, U Hermann
Journal of Construction Engineering and Management 147 (11), 04021160, 2021
182021
Optimized variable resource allocation framework for scheduling of fast-track industrial construction projects
M Taghaddos, A Mousaei, H Taghaddos, U Hermann, Y Mohamed, ...
Automation in Construction 158, 105208, 2024
52024
Planning of mobile crane walking operations in congested industrial construction sites
K Aghajamali, A Nekouvaght Tak, H Taghaddos, A Mousaei, ...
Journal of Construction Engineering and Management 149 (7), 04023047, 2023
32023
Developing a Hybrid BIM-based Structural Health Monitoring System for Safety Enhancement
A Bolourani, M Bitaraf, H Taghaddos, A Mousaei
2018
Sustav trenutno ne može provesti ovu radnju. Pokušajte ponovo kasnije.
Članci 1–9