Causes of delay in construction projects in the oil and gas industry in the gulf cooperation council countries: a case study M Ruqaishi, HA Bashir Journal of management in engineering 31 (3), 05014017, 2015 | 243 | 2015 |
Estimating design complexity HA Bashir, V Thomson Journal of Engineering Design 10 (3), 247-257, 1999 | 158 | 1999 |
A mathematical approach for the formation of manufacturing cells Z Albadawi, HA Bashir, M Chen Computers & Industrial Engineering 48 (1), 3-21, 2005 | 154 | 2005 |
Models for estimating design effort and time HA Bashir, V Thomson Design Studies 22 (2), 141-155, 2001 | 129 | 2001 |
Metrics for design projects: a review HA Bashir, V Thomson Design studies 20 (3), 263-277, 1999 | 98 | 1999 |
On the implementation of ISO 9001: 2000: a comparative investigation AMS Al‐Rawahi, HA Bashir The TQM Journal 23 (6), 673-687, 2011 | 69 | 2011 |
Estimating design effort for GE hydro projects HA Bashir, V Thomson Computers & Industrial Engineering 46 (2), 195-204, 2004 | 54 | 2004 |
Effective monitoring of carbon emissions from industrial sector using statistical process control M Shamsuzzaman, A Shamsuzzoha, A Maged, S Haridy, H Bashir, ... Applied Energy 300, 117352, 2021 | 48 | 2021 |
An analogy-based model for estimating design effort HA Bashir, V Thomson Design Studies 22 (2), 157-167, 2001 | 47 | 2001 |
Modeling and analyzing factors affecting project delays using an integrated social network-fuzzy MICMAC approach H Bashir, U Ojiako, C Mota Engineering Management Journal 32 (1), 26-36, 2020 | 36 | 2020 |
Evaluating the layout of the emergency department of a public hospital using computer simulation modeling: A case study M Khadem, HA Bashir, Y Al-Lawati, F Al-Azri 2008 IEEE International Conference on Industrial Engineering and Engineering …, 2008 | 34 | 2008 |
The analysis of information flow interdependencies within projects H Bashir, U Ojiako, A Marshall, M Chipulu, AA Yousif Production Planning & Control 33 (1), 20-36, 2022 | 33 | 2022 |
Applying interpretive structural modeling to cost overruns in construction projects in the sultanate of Oman K Alzebdeh, HA Bashir, SK Al Siyabi The Journal of Engineering Research [TJER] 12 (1), 53-68, 2015 | 33 | 2015 |
An integrated ISM-MICMAC approach for modelling and analysing dependencies among engineering parameters in the early design phase H Bashir, U Ojiako Journal of Engineering Design 31 (8-9), 461-483, 2020 | 29 | 2020 |
Modelling and analyzing of critical success factors for implementing UAE’s Government Excellence Model in the public sector: an ISM and Fuzzy-MICMAC approach OK AlZawati, H Bashir, I Alsyouf International Journal of System Assurance Engineering and Management 11 …, 2020 | 24 | 2020 |
Innovation readiness in public sector service delivery: an exploration U Ojiako, EJH AlRaeesi, M Chipulu, A Marshall, H Bashir Production Planning & Control 35 (5), 437-460, 2024 | 23 | 2024 |
Lean warehousing: a case study in a retail hypermarket H Bashir, M Shamsuzzaman, S Haridy, I Alsyouf IEOM Society International, 1599-1607, 2020 | 22 | 2020 |
Modeling and analyzing project interdependencies in project portfolios using an integrated social network analysis-fuzzy TOPSIS MICMAC approach H Al Zaabi, H Bashir International Journal of System Assurance Engineering and Management 11 (6 …, 2020 | 21 | 2020 |
Implementation of environmentally sustainable practices and their association with ISO 14001 certification in the construction industry of the United Arab Emirates H Bashir, U Ojiako, S Haridy, M Shamsuzzaman, R Musa Sustainability: Science, Practice and Policy 18 (1), 55-69, 2022 | 20 | 2022 |
Factor analysis of obstacles restraining productivity improvement programs in manufacturing enterprises in Oman HA Bashir, K Alzebdeh, AMA Al Riyami Journal of Industrial Engineering 2014 (1), 195018, 2014 | 20 | 2014 |