Követés
Indra Setiawan
Indra Setiawan
ASTRA Polytechnic
E-mail megerősítve itt: polytechnic.astra.ac.id - Kezdőlap
Cím
Hivatkozott rá
Hivatkozott rá
Év
A systematic literature review of key performance indicators (KPIs) implementation
I Setiawan, HH Purba
Journal of Industrial Engineering & Management Research 1 (3), 200-208, 2020
652020
Implementation of total productive maintenance to improve overall equipment effectiveness of linear accelerator synergy platform cancer therapy
DI Sukma, HA Prabowo, I Setiawan, H Kurnia, IM Fahturizal
International Journal of Engineering 35 (7), 1246-1256, 2022
552022
Implementation of Six Sigma in the DMAIC Approach for Quality Improvement in the Knitting Socks Industry
H Kurnia, C Jaqin, H Hardi Purba, I Setiawan
TEKSTİL VE MÜHENDİS 28 (124), 269-278, 2021
492021
Value Stream Mapping: Literature review and implication for service industry
I Setiawan, O Tumanggor, HH Purba
Jurnal Sistem Teknik Industri 23 (2), 155–166, 2021
472021
Defect reduction of roof panel part in the export delivery process using the DMAIC method: a case study
I Setiawan, S Setiawan
Jurnal Sistem Dan Manajemen Industri 4 (2), 108-116, 2020
392020
Implementasi metode Failure Mode and Effect Analysis pada Industri di Asia–Kajian Literature
T Aprianto, I Setiawan, HH Purba
Matrik: Jurnal Manajemen dan Teknik Industri Produksi 21 (2), 165-174, 2021
222021
Integration of waste assessment model and lean automation to improve process cycle efficiency in the automotive industry
S Setiawan, I Setiawan, C Jaqin, HA Prabowo, HH Purba
Quality Innovation Prosperity 25 (3), 48-64, 2021
192021
Effects of ergonomics intervention on work accidents in the construction sector and their effect on productivity
IA Asih, I Setiawan, H Hernadewita, H Hendra
Jurnal Sistem dan Manajemen Industri 6 (1), 45-55, 2022
152022
Key Performance Indicators Implementation: Literature Review and Development for Performance Measurement
W Atikno, I Setiawan, DA Taufik
IJIEM-Indonesian Journal of Industrial Engineering and Management 2 (3), 189-197, 2021
152021
Analysis of preventive maintenance and breakdown maintenance on production achievement in the food seasoning industry
I Setiawan, A Bahrudin, MM Arifin, WI Fipiana, V Lusia
OPSI 14 (2), 253-261, 2021
142021
Integration of Total Productive Maintenance and Industry 4.0 to increase the productivity of NC Bore machines in the Musical Instrument Industry
I Setiawan, U Buana, U Buana
Proceedings of the 11th Annual International Conference on Industrial …, 2021
142021
Quality Function Deployment in Healthcare: Systematic Literature Review
DI Sukma, I Setiawan, H Kurnia, HH Purba
Jurnal Sistem Teknik Industri 24 (1), 15-27, 2022
92022
A Systematic Literature Review of Overall Equipment Efectiveness Implementation in Asia
DI Sukma, I Setiawan, HH Purba
Journal of Industrial & Quality Engineering p-ISSN 2303, 2715, 2021
82021
Aggregate Planning Implementation for Planning and Controlling The Materials in The Beverage Packaging Industry
I Setiawan, N Nurdiansyah, M Tosin, V Lusia, M Wahid
Spektrum Industri 20 (1), 91-100, 2022
72022
A systematic literature review of implementation six sigma in manufacturing industries
I Setiawan, F Debora
Operation Excellence 12 (3), 318-331, 0
6*
PENINGKATAN KEPUASAN KONSUMEN PADA INDUSTRI RESTORAN DENGAN METODE QFD
S Hendra, I Setiawan, HH Purba, AM Wahono, SB Dito
Matrik: Jurnal Manajemen dan Teknik Industri Produksi 22 (2), 111-120, 2022
52022
Layout Redesign to Eliminate Stagnation Using Blocplan to Increase Production Efficiency
D Wicaksono, I Setiawan, FL Hasan
OPSI 15 (2), 238-245, 2022
42022
The effect of occupational health and safety on the performance of employee of Tire Industry Indonesia
I Setiawan, NF Aldrianto, D Arifin, WI Fipiana, V Lusia
Journal Industrial Servicess 7 (2), 253-258, 2022
42022
Implementasi Metode Value Stream Mapping Pada Industri: Tinjauan Literatur Sistematis
B Setiawan, I Setiawan, H Kurnia, M Wahid, HH Purba
Journal of Industrial & Quality Engineering p-ISSN 2303, 2715, 2022
42022
Integrasi Linear Regression dan Aggregate Planning untuk Perencanaan dan Pengendalian Produksi Leaf Spring Hino OW 190/200 di Industri Komponen Otomotif
DA Taufik, I Setiawan, M Wahid, A Rochim, M Tosin
Jurnal Operations Excellence: Journal of Applied Industrial Engineering 13 …, 2021
42021
A rendszer jelenleg nem tudja elvégezni a műveletet. Próbálkozzon újra később.
Cikkek 1–20