Követés
Christina Burt
Christina Burt
Computing and Information Systems, The University of Melbourne
E-mail megerősítve itt: ms.unimelb.edu.au - Kezdőlap
Cím
Hivatkozott rá
Hivatkozott rá
Év
Corrigendum: Match factor for heterogeneous truck and loader fleets
C Burt, L Caccetta
International Journal of Mining, Reclamation and Environment 22 (1), 84-85, 2008
192*2008
Equipment selection for surface mining: a review
CN Burt, L Caccetta
Interfaces 44 (2), 143-162, 2014
1462014
Equipment selection for mining: with case studies
CN Burt, L Caccetta
Springer International Publishing, 2018
802018
Models for Mining Equipment Selection
C Burt, L Caccetta, S Hill, P Welgama
MODSIM 2005 International Congress on Modelling and Simulation, 170-176, 2005
68*2005
An optimisation approach to materials handling in surface mines
CN Burt
Curtin University of Technology., 2008
642008
Equipment selection with heterogeneous fleets for multiple-period schedules
C Burt, L Caccetta, P Welgama, L Fouché
Journal of the Operational Research Society 62 (8), 1498-1509, 2011
302011
A decomposition-based heuristic for collaborative scheduling in a network of open-pit mines
ML Blom, CN Burt, AR Pearce, PJ Stuckey
INFORMS Journal on Computing 26 (4), 658-676, 2014
262014
Planning for mining operations with time and resource constraints
N Lipovetzky, C Burt, A Pearce, P Stuckey
Proceedings of the International Conference on Automated Planning and …, 2014
242014
An MILP approach to Multi-location, Multi-Period Equipment Selection for Surface Mining with Case Studies
C Burt, L Caccetta, L Fouché, P Welgama
Journal of Industrial and Management Optimization, 2013
192013
Scheduling with fixed maintenance, shared resources and nonlinear feedrate constraints: A mine planning case study
CN Burt, N Lipovetzky, AR Pearce, PJ Stuckey
Integration of AI and OR Techniques in Constraint Programming: 12th …, 2015
102015
Equipment Selection for Surface Mining: A Review
L Cacceta, C Burt
Journal Interface 44 (2), 143-162, 2013
82013
Erratum to: Equipment selection for mining: With case studies
CN Burt, L Caccetta
Equipment Selection for Mining: With Case Studies, E1-E1, 2018
62018
Model for Mining Equipment Selection [jurnal], Curtin University Of Teknology
CN Burt
Perth Australia, 2014
62014
Approximate Uni-directional Benders Decomposition
CN Burt, N Lipovetzky, AR Pearce, PJ Stuckey
Planning, Search and Optimization Workshop: AAAI 2015, 2014
42014
Caccetta, l.(2008).“Match factor for heterogeneous truck and loader fleets
C Burt
International journal of mining, reclamation and Enviroment, 0
4
Delivering on delivery: Optimisation and the future of vehicle routing
C Burt, P Hart, D Petrova, A West
Operations Research Proceedings 2017: Selected Papers of the Annual …, 2018
32018
Scheduling Tools for Open-Pit Mining Operations
M Blom, C Burt, N Lipovetzky, A Pearce, P Stuckey
ICAPS-15 Sysdemo, 2015
32015
Exact Models for the k-Connected Minimum Energy Problem
C Burt, Y Chan, N Sonenberg
International Conference on Ad Hoc Networks, 392-406, 2009
32009
Accurate costing in mixed integer utilisation mining models
C Burt, Y Chan
18th World IMACS Congress and MODSIM09 International Congress On Modelling …, 2009
32009
Generating explanations for mathematical optimisation: Solution framework and case study
C Burt, K Klimova, B Primas
ICAPS 2018 Workshop on Explainable Planning (XAIP), 2018
22018
A rendszer jelenleg nem tudja elvégezni a műveletet. Próbálkozzon újra később.
Cikkek 1–20