Ikuti
Karen Milady Castañeda Parra
Karen Milady Castañeda Parra
Email yang diverifikasi di correo.uis.edu.co
Judul
Dikutip oleh
Dikutip oleh
Tahun
Cost overrun causative factors in road infrastructure projects: A frequency and importance analysis
RF Herrera, O Sánchez, K Castañeda, H Porras
Applied Sciences 10 (16), 5506, 2020
1192020
BIM-based traffic analysis and simulation at road intersection design
K Castañeda, O Sánchez, RF Herrera, E Pellicer, H Porras
Automation in Construction 131, 103911, 2021
612021
Highway planning trends: a bibliometric analysis
K Castañeda, O Sánchez, RF Herrera, G Mejía
Sustainability 14 (9), 5544, 2022
512022
Delay causes in road infrastructure projects in developing countries
G Mejía, O Sánchez, K Castañeda, E Pellicer
Revista de la Construcción 19 (2), 220-234, 2020
492020
Tecnologías" Building Information Modeling" en la elaboración de presupuestos de construcción de estructuras en concreto reforzado
H Porras-Díaz, OG Sánchez-Rivera, JA Galvis-Guerra, NA Jaimez-Plata, ...
Entramado 11 (1), 230-249, 2015
392015
Planificación del flujo de caja de proyectos de construcción basada en BIM y dinámica de sistemas
KM Castañeda-Parra, OG Sánchez-Rivera, H Porras-Díaz
Entramado 17 (1), 272-288, 2021
262021
Building information modeling and complementary technologies in heritage buildings: A bibliometric analysis
A Puerto, K Castañeda, O Sánchez, CA Peña, L Gutiérrez, P Sáenz
Results in Engineering, 102192, 2024
152024
Digitalization and sustainability in linear projects trends: a bibliometric analysis
NE Lozano-Ramírez, O Sánchez, D Carrasco-Beltrán, S Vidal-Méndez, ...
Sustainability 15 (22), 15962, 2023
132023
Benefits of building information modeling in road projects for cost overrun factors mitigation
O Sánchez, K Castañeda, RF Herrera, E Pellicer
Construction Research Congress 2022, 472-482, 2022
132022
Delay factors: A comparative analysis between road infrastructure and building projects
O Sánchez, K Castañeda, G Mejía, E Pellicer
Construction Research Congress 2020, 223-231, 2020
132020
Stakeholders’ issues as a source of project delays: a meta-analysis between building and road projects
G Mejía, O Sánchez, K Castañeda, E Pellicer
Revista de la construcción 22 (1), 51-73, 2023
82023
Benefits of Last Planner® System in mitigation of delay causes in road infrastructure projects
OG Sánchez, KM Castañeda, RF Herrera, E Pellicer
SIMPÓSIO BRASILEIRO DE GESTÃO E ECONOMIA DA CONSTRUÇÃO 11, 1-8, 2019
82019
Exploring the influence of linear infrastructure projects 4.0 technologies to promote sustainable development in smart cities
O Sánchez, K Castañeda, S Vidal-Méndez, D Carrasco-Beltrán, ...
Results in Engineering 23, 102824, 2024
72024
Building information modeling uses and complementary technologies in road projects: A systematic review
K Castañeda, O Sánchez, RF Herrera, A Gómez-Cabrera, G Mejía
Buildings 14 (3), 563, 2024
72024
Cost deviation causes in Colombian construction projects: a frequency and severity analysis
O Sánchez, K Castañeda, RF Herrera, E Pellicer, L Almanza, R Cadavid
2021 congreso internacional de innovación y tendencias en ingeniería …, 2021
72021
Tecnologías “Building Information Modeling” en la elaboración de presupuestos de construcción de estructuras en concreto reforzado. Entramado, 11 (1), 230–249
H Porras-Díaz, OG Sánchez-Rivera, JA Galvis-Guerra, NA Jaimez-Plata, ...
62015
Tecnologias de" Building Information Modeling" na elaboração de orçamentos para a construção de estruturas de concreto armado
H Porras-Díaz, OG Sánchez-Rivera, JA Galvis-Guerra, NA Jaimez-Plata, ...
Entramado 11 (1), 230-249, 2015
6*2015
Set-based design in construction projects: benefits, difficulties and trends
K Castañeda, RF Herrera, O Sánchez, G Mejía
Proceedings of the 31st Annual Conference of the International Group for …, 2023
22023
Systematic review of Lean Construction: an approach to sustainability and efficiency in construction management
G Garcés, E Forcael, C Osorio, K Castañeda, O Sánchez
Journal of Infrastructure Preservation and Resilience 6 (1), 1-28, 2025
2025
Deficiencies causes in road construction scheduling: Perspectives from construction professionals
K Castañeda, O Sánchez, RF Herrera, G Mejía
Heliyon 11 (2), 2025
2025
Sistem tidak dapat melakukan operasi ini. Coba lagi nanti.
Artikel 1–20