Ikuti
Jan Emblemsvåg
Jan Emblemsvåg
NTNU - Dept of Ocean Operations and Civil Engineering
Email yang diverifikasi di ntnu.no
Judul
Dikutip oleh
Dikutip oleh
Tahun
Life-cycle costing: Using activity-based costing and Monte Carlo methods to manage future costs and risks
J Emblemsvåg
John wiley & sons, 2003
3882003
Validating design methods and research: the validation square
K Pedersen, J Emblemsvåg, R Bailey, JK Allen, F Mistree
International Design Engineering Technical Conferences and Computers and …, 2000
2352000
Strategic risk analysis–a field version
J Emblemsvåg, L Endre Kjølstad
Management decision 40 (9), 842-852, 2002
1892002
Activity-based cost and environmental management
J Emblemsvåg, B Bras, J Emblemsvåg, B Bras
Activity-Based Cost and Environmental Management: A Different Approach to …, 2001
1502001
The validation square: how does one verify and validate a design method
CC Seepersad, K Pedersen, J Emblemsvåg, R Bailey, JK Allen, F Mistree
Decision making in engineering design, 303-314, 2006
1482006
Activity‐based life‐cycle costing
J Emblemsvag
Managerial Auditing Journal 16 (1), 17-27, 2001
1272001
Lean project planning in shipbuilding
J Emblemsvåg
Journal of Ship Production and Design 30 (02), 79-88, 2014
842014
Qualitative risk analysis: some problems and remedies
J Emblemsvåg, L Endre Kjølstad
Management Decision 44 (3), 395-408, 2006
802006
The use of activity-based costing, uncertainty, and disassembly action charts in demanufacture cost assessments
B Bras, J Emblemsvåg
International Design Engineering Technical Conferences and Computers and …, 1995
711995
Decision support in selecting maintenance organization
J Emblemsvåg, L Tonning
Journal of Quality in Maintenance Engineering 9 (1), 11-24, 2003
672003
Wind energy is not sustainable when balanced by fossil energy
J Emblemsvåg
Applied Energy 305, 117748, 2022
632022
On Quality 4.0 in project-based industries
J Emblemsvåg
The TQM Journal 32 (4), 725-739, 2020
592020
Activity‐based life‐cycle costing in long‐range planning
EJ Rodríguez Rivero, J Emblemsvåg
Review of Accounting and Finance 6 (4), 370-390, 2007
572007
Process thinking—a new paradigm for science and engineering
J Emblemsvåg, B Bras
Futures 32 (7), 635-654, 2000
522000
The'Validation Square'-Validating Design Methods
K Pedersen, J Emblemsvag, R Bailey, J Allen, F Mistree
ASME Design Theory and Methodology Conference, 1-18, 2000
522000
The augmented subjective risk management process
J Emblemsvåg
Management Decision 48 (2), 248-259, 2010
442010
Activity-based costing in design for product retirement
J Emblemsvåg, B Bras
International Design Engineering Technical Conferences and Computers and …, 1994
441994
Life-cycle cost analysis of an innovative marine dual-fuel engine under uncertainties
KQ Bui, LP Perera, J Emblemsvåg
Journal of Cleaner Production 380, 134847, 2022
432022
Environmental impacts of protein-production from farmed seaweed: Comparison of possible scenarios in Norway
M Koesling, NP Kvadsheim, J Halfdanarson, J Emblemsvåg, C Rebours
Journal of cleaner production 307, 127301, 2021
422021
Strategic considerations for establishing a large-scale seaweed industry based on fish feed application: a Norwegian case study
J Emblemsvåg, NP Kvadsheim, J Halfdanarson, M Koesling, BT Nystrand, ...
Journal of Applied Phycology 32, 4159-4169, 2020
352020
Sistem tidak dapat melakukan operasi ini. Coba lagi nanti.
Artikel 1–20