Ikuti
Ghang Lee
Judul
Dikutip oleh
Dikutip oleh
Tahun
BIM handbook: A guide to building information modeling for owners, designers, engineers, contractors, and facility managers
R Sacks, C Eastman, G Lee, P Teicholz
John Wiley & Sons, 2018
13662018
Specifying parametric building object behavior (BOB) for a building information modeling system
G Lee, R Sacks, CM Eastman
Automation in construction 15 (6), 758-776, 2006
6982006
Parametric 3D modeling in building construction with examples from precast concrete
R Sacks, CM Eastman, G Lee
Automation in construction 13 (3), 291-312, 2004
3912004
Where to focus for successful adoption of building information modeling within organization
J Won, G Lee, C Dossick, J Messner
Journal of construction engineering and management 139 (11), 04013014, 2013
3782013
Quantification of construction waste prevented by BIM-based design validation: Case studies in South Korea
J Won, JCP Cheng, G Lee
Waste Management 49, 170-180, 2016
2602016
The status of BIM adoption on six continents
W Jung, G Lee
International journal of civil, environmental, structural, construction and …, 2015
2132015
D3 City project—Economic impact of BIM-assisted design validation
G Lee, HK Park, J Won
Automation in Construction 22, 577-586, 2012
2092012
A BIM-and sensor-based tower crane navigation system for blind lifts
G Lee, J Cho, S Ham, T Lee, G Lee, SH Yun, HJ Yang
Automation in construction 26, 1-10, 2012
1792012
An analysis of BIM jobs and competencies based on the use of terms in the industry
M Uhm, G Lee, B Jeon
Automation in Construction 81, 67-98, 2017
1592017
Process model perspectives on management and engineering procedures in the precast/prestressed concrete industry
R Sacks, CM Eastman, G Lee
Journal of construction engineering and management 130 (2), 206-215, 2004
1272004
How to tell if a BIM project is successful: A goal-driven approach
J Won, G Lee
Automation in Construction 69, 34-43, 2016
1262016
A laser-technology-based lifting-path tracking system for a robotic tower crane
G Lee, HH Kim, CJ Lee, SI Ham, SH Yun, H Cho, BK Kim, GT Kim, K Kim
Automation in Construction 18 (7), 865-874, 2009
1262009
A target benchmark of the impact of three-dimensional parametric modeling in precast construction
R Sacks, CM Eastman, G Lee, D Orndorff
PCI journal 50 (4), 126, 2005
1092005
Process, productivity, and economic analyses of BIM–based multi-trade prefabrication—A case study
S Jang, G Lee
Automation in Construction 89, 86-98, 2018
1022018
Automated classification of building information modeling (BIM) case studies by BIM use based on natural language processing (NLP) and unsupervised learning
N Jung, G Lee
Advanced Engineering Informatics 41, 100917, 2019
902019
Parallel vs. sequential cascading MEP coordination strategies: A pharmaceutical building case study
G Lee
Automation in Construction 43, 170-179, 2014
882014
BIM policy and management
G Lee, A Borrmann
Construction management and economics 38 (5), 413-419, 2020
862020
Eliciting information for product modeling using process modeling
G Lee, CM Eastman, R Sacks
Data & Knowledge Engineering 62 (2), 292-307, 2007
812007
A Guide to Building Information Modeling for owners, designers, engineers, contractors, and facility managers
R Sacks, C Eastman, G Lee, P Teicholz, BIM Handbook
Sacks, R.(eds) 688, 2018
742018
Case studies of BIM in use
T Olofsson, G Lee, C Eastman
Electronic journal of information technology in construction 13, 244-245, 2008
742008
Sistem tidak dapat melakukan operasi ini. Coba lagi nanti.
Artikel 1–20