Ikuti
Vincent J.L. Gan
Vincent J.L. Gan
Email yang diverifikasi di nus.edu.sg - Beranda
Judul
Dikutip oleh
Dikutip oleh
Tahun
BIM-based framework for automatic scheduling of facility maintenance work orders
W Chen, K Chen, JCP Cheng, Q Wang, VJL Gan
Automation in construction 91, 15-30, 2018
2722018
BIM-enabled computerized design and digital fabrication of industrialized buildings: A case study
R He, M Li, VJL Gan, J Ma
Journal of Cleaner Production 278, 123505, 2021
2102021
Integrating 4D BIM and GIS for construction supply chain management
Y Deng, VJL Gan, M Das, JCP Cheng, C Anumba
Journal of construction engineering and management 145 (4), 04019016, 2019
1862019
Simulation optimisation towards energy efficient green buildings: Current status and future trends
VJL Gan, IMC Lo, J Ma, KT Tse, JCP Cheng, CM Chan
Journal of Cleaner Production 254, 120012, 2020
1842020
Holistic BIM framework for sustainable low carbon design of high-rise buildings
VJL Gan, M Deng, KT Tse, CM Chan, IMC Lo, JCP Cheng
Journal of Cleaner Production 195, 1091-1104, 2018
1622018
Reinforced concrete structural design optimization: A critical review
M Afzal, Y Liu, JCP Cheng, VJL Gan
Journal of Cleaner Production 260, 120623, 2020
1612020
A comparative analysis of embodied carbon in high-rise buildings regarding different design parameters
VJL Gan, CM Chan, KT Tse, IMC Lo, JCP Cheng
Journal of Cleaner Production 161, 663-675, 2017
1442017
Identification of high impact factors of air quality on a national scale using big data and machine learning techniques
J Ma, Y Ding, JCP Cheng, F Jiang, Y Tan, VJL Gan, Z Wan
Journal of Cleaner Production 244, 118955, 2020
1402020
Developing a CO2-e accounting method for quantification and analysis of embodied carbon in high-rise buildings
VJL Gan, JCP Cheng, IMC Lo, CM Chan
Journal of Cleaner Production 141, 825-836, 2017
1382017
Spatiotemporal prediction of PM2. 5 concentrations at different time granularities using IDW-BLSTM
J Ma, Y Ding, VJL Gan, C Lin, Z Wan
Ieee Access 7, 107897-107907, 2019
1362019
Data-driven predictive control for smart HVAC system in IoT-integrated buildings with time-series forecasting and reinforcement learning
D Zhuang, VJL Gan, ZD Tekler, A Chong, S Tian, X Shi
Applied Energy 338, 120936, 2023
1212023
Analyzing the leading causes of traffic fatalities using XGBoost and grid-based analysis: a city management perspective
J Ma, Y Ding, JCP Cheng, Y Tan, VJL Gan, J Zhang
IEEE Access 7, 148059-148072, 2019
1122019
Parametric modelling and evolutionary optimization for cost-optimal and low-carbon design of high-rise reinforced concrete buildings
VJL Gan, CL Wong, KT Tse, JCP Cheng, IMC Lo, CM Chan
Advanced engineering informatics 42, 100962, 2019
1122019
A Lag-FLSTM deep learning network based on Bayesian Optimization for multi-sequential-variant PM2. 5 prediction
J Ma, Y Ding, JCP Cheng, F Jiang, VJL Gan, Z Xu
Sustainable Cities and Society 60, 102237, 2020
1042020
BIM-based graph data model for automatic generative design of modular buildings
VJL Gan
Automation in Construction 134, 104062, 2022
1012022
A holistic framework to utilize natural ventilation to optimize energy performance of residential high-rise buildings
AU Weerasuriya, X Zhang, VJL Gan, Y Tan
Building and environment 153, 218-232, 2019
1012019
Damage mechanism and interfacial transition zone characteristics of concrete under sulfate erosion and Dry-Wet cycles
R He, S Zheng, VJL Gan, Z Wang, J Fang, Y Shao
Construction and Building Materials 255, 119340, 2020
942020
Developing an evacuation evaluation model for offshore oil and gas platforms using BIM and agent-based model
JCP Cheng, Y Tan, Y Song, Z Mei, VJL Gan, X Wang
Automation in Construction 89, 214-224, 2018
892018
Simulation-based evolutionary optimization for energy-efficient layout plan design of high-rise residential buildings
VJL Gan, HK Wong, KT Tse, JCP Cheng, IMC Lo, CM Chan
Journal of cleaner production 231, 1375-1388, 2019
842019
Automated semantic segmentation of industrial point clouds using ResPointNet++
C Yin, B Wang, VJL Gan, M Wang, JCP Cheng
Automation in Construction 130, 103874, 2021
822021
Sistem tidak dapat melakukan operasi ini. Coba lagi nanti.
Artikel 1–20