Segui
Dr. Abbas M. Burhan
Dr. Abbas M. Burhan
University of Baghdad/ College of Engineering/ Department of Civil Engineering
Email verificata su coeng.uobaghdad.edu.iq
Titolo
Citata da
Citata da
Anno
Developing an integrative data intelligence model for construction cost estimation
ZH Ali, AM Burhan, M Kassim, Z Al-Khafaji
Complexity 2022 (1), 4285328, 2022
242022
Investigating the causes of poor cost control in Iraqi construction projects
NN Abbas, AM Burhan
Engineering, Technology & Applied Science Research 12 (1), 8075-8079, 2022
192022
Investigating the effects of economic crisis on construction projects in Iraq
GA Fadhil, AM Burhan
E3S Web of Conferences 318, 02005, 2021
192021
Hybrid machine learning approach for construction cost estimation: An evaluation of extreme gradient boosting model
ZH Ali, AM Burhan
Asian Journal of Civil Engineering 24 (7), 2427-2442, 2023
172023
Developing a system for assessing the sustainability in school building projects
HK Alhilli, AM Burhan
Environment, Development and Sustainability 23 (12), 17483-17502, 2021
172021
Fault tree analysis as a modern technique for investigating causes of some construction project problems
AM Burhan
Journal of Engineering 16 (02), 5214-5224, 2010
152010
Developing Crisis Management System for Construction Projects in Iraq.
GA Fadhil, AM Burhan
Journal of Engineering (17264073) 28 (1), 2022
132022
BIM-Supporting System by Integrating Risk Management and Value Management
AMB Ali AbdulJabbar Alfahad
Engineering, Technology & Applied Science Research 13 (6), 12130-12137, 2023
102023
Risk assessment in bot contracts using ahp technique
SFR AL-Aga, AM Burhan
Journal of Engineering 29 (01), 61-75, 2023
102023
Time-Cost-Quality Trade-off Model for Optimal Pile Type Selection Using Discrete Particle Swarm Optimization Algorithm
AMB Hanaa H. Lateef
civil engineering journal 5 (11), 2461-2471, 2019
102019
Prediction of the Delay in the Portfolio Construction Using Naïve Bayesian Classification Algorithms
KR Erzaij, AM Burhan, WA Hatem, RH Ali
Civil and Environmental Engineering 17 (2), 673-680, 2021
92021
Cost Estimation Process for Construction Residential Projects by Using Multifactor Linear Regression Technique
HSHA Abbas Mohammed Burhan Alshemosi
International Journal of Science and Research (IJSR) 6 (6), 2017
9*2017
Developing a Model to Estimate the Productivity of Ready Mixed Concrete Batch Plant
AMB Hussein T. Almusawi
Journal of Engineering 26 (10), 2020
82020
Using Neural Network Model to Estimate the Optimum Time for Repetitive Construction Projects in Iraq
MRA Abbas M. Burhan
Association of Arab Universities Journal of Engineering Sciences (PISSN …, 2020
8*2020
Evaluation of the current status of the cost control processes in Iraqi construction projects
NN Abbas, AM Burhan
Journal of Engineering 29 (1), 128-144, 2023
62023
Non-Profit Organization Project Selection Process Using the Hygiene Method of Multi-Criteria Decision Making
AR Radhi, AM Burhan
Engineering, Technology & Applied Science Research 12 (5), 9097-9101, 2022
62022
Analyzing the Obstacles of Investment Process in Iraq Using (5 Whys) and Focus Group Discussion (FQD) Techniques
AM Jaber, AM Burhan
IOP Conference Series: Materials Science and Engineering 901 (1), 012030, 2020
62020
Developing a mathematical model for planning repetitive construction projects by using support vector machine technique
AM Burhan, KR Erzaij, WA Hatem
Civil and Environmental Engineering 17 (2), 371-379, 2021
52021
Benefit and challenge of integrating BIM With GIS In Iraqi construction projects
AN Yousif, AM Burhan
IOP Conference Series: Materials Science and Engineering 1105 (1), 012091, 2021
52021
Developing a Computer Program to Solve the Implementation Problems of Public Investment Projects in Iraq
SM Almissary, AM Burhan
IOP Conference Series: Materials Science and Engineering 901 (1), 012029, 2020
52020
Il sistema al momento non può eseguire l'operazione. Riprova più tardi.
Articoli 1–20