A continuous review policy for two complementary products with interrelated demand S Poormoaied, Z Atan Computers & Industrial Engineering, 2020 | 18 | 2020 |
Optimal inventory and timing decisions for emergency shipments S Poormoaied, Z Atan, T de Kok, T Van Woensel IISE Transactions 52 (8), 904-925, 2020 | 16 | 2020 |
GPSO-LS algorithm for a multi-item EPQ model with production capacity restriction M Pirayesh, S Poormoaied Applied Mathematical Modelling 39 (17), 5011-5032, 2015 | 16 | 2015 |
Inventory decision in a periodic review inventory model with two complementary products S Poormoaied Annals of Operations Research, 2021 | 13 | 2021 |
Analysis of an inventory system with emergency ordering option at the time of supply disruption S Poormoaied, EZ Demirci OR Spectrum, 2021 | 11 | 2021 |
Emergency shipment decision in newsvendor model S Poormoaied, ZS Hosseini Computers & Industrial Engineering 160, 107545, 2021 | 9 | 2021 |
A multi-attribute utility theory approach to ordering policy for perishable items S Poormoaied, Z Atan International Journal of Production Economics 225, 107582, 2020 | 9 | 2020 |
An exact analysis on age-based control policies for perishable inventories S Poormoaied, Ü Gürler, E Berk IISE Transactions, 1-62, 2020 | 8 | 2020 |
Optimizing combination of job shop scheduling and quadratic assignment problem through multi-objective decision making approach M Kazemi, S Poormoaied, G Eslami Management Science Letters 2 (6), 2011-2018, 2012 | 8 | 2012 |
On the (Q,r) policy for perishables with positive lead times and multiple outstanding orders E Berk, Ü Gürler, S Poormoaied Annals of Operations Research 284 (1), 81-98, 2020 | 6 | 2020 |
Optimum quantities of make and buy in multi-item manufacturing firms with restriction in production capacity M Pirayesh, S Poormoaied 2011 IEEE International Conference on Industrial Engineering and Engineering …, 2011 | 5 | 2011 |
Location and job shop scheduling problem with minimizing maximum completion time goal in fuzzy environment simultaneously through ranking fuzzy numbers and α-cut fuzzy M Dastpak, S Poormoaied, M Naderpoor Proc. Industrial Engineering and Operations Management, 10-19, 2012 | 3 | 2012 |
Quantity-Based Emergency Shipment Policies S Poormoaied, Z Atan, T Van Woensel IISE Transactions 20 (X), 2022 | 2 | 2022 |
Location and job shop scheduling problem in fuzzy environment M Pirayesh, S Poormoaied the 5th Int. Conference of the Iranian Society of Operations Research, 2012 | 1 | 2012 |
The assignment of project managers to projects in an uncertain dynamic environment A Rezaeian, H Koosha, M Ranjbar, S Poormoaied Annals of Operations Research 341 (2), 1107-1134, 2024 | | 2024 |
Analysis of an inventory system with emergency ordering option at the time of supply disruption EZ Demirci, S Poormoaied SPRINGERONE NEW YORK PLAZA, SUITE 4600, NEW YORK, NY 10004, UNITED STATES, 2021 | | 2021 |
Age and Lifetime based Policies for Perishable Items/Kısa Ömürlü Ürünler Için Yaş ve Raf öMrüne Dayalı Politikalar S Poormoaied Bilkent Universitesi (Turkey), 2018 | | 2018 |
Lifetime based policies for perishable items S Poormoaied, Ü Gürler, E Berk Ph.D. thesis, 2018 | | 2018 |
Economic order and production quantities in an integrated vendor-buyer supply chain S Poormoaied, MH Abolbashari, M Pirayesh International Conference on Industrial Engineering, 2015 | | 2015 |
Minimizing total weighted tardiness, earliness, and transportation costs in fuzzy job shop scheduling and location problem S Poormoaied, M Pirayesh Journal of Industrial and Systems Engineering 6, 2012 | | 2012 |