Two continuous-time assignment-based models for the multi-mode resource-constrained project scheduling problem M Gnägi, T Rihm, A Zimmermann, N Trautmann Computers & industrial engineering 129, 346-353, 2019 | 16 | 2019 |
MIP formulations for an application of project scheduling in human resource management T Rihm, N Trautmann, A Zimmermann Flexible Services and Manufacturing Journal 30, 609-639, 2018 | 10 | 2018 |
An assignment-based continuous-time MILP model for the resource-constrained project scheduling problem T Rihm, N Trautmann 2017 IEEE International Conference on Industrial Engineering and Engineering …, 2017 | 10 | 2017 |
A decomposition heuristic for an assessment center planning problem T Rihm 15th International Conference on Project Management and Scheduling, Valencia …, 2016 | 5 | 2016 |
Improving fairness in staff assignment: An approach for lexicographic goal programming T Rihm, P Baumann 2015 IEEE International Conference on Industrial Engineering and Engineering …, 2015 | 5 | 2015 |
A continuous-time assignment-based MILP formulation for the resource-constrained project scheduling problem N Trautmann, T Rihm, NJ Saner, A Zimmermann Proceedings of the 16th International Conference on Project Management and …, 2018 | 4 | 2018 |
Staff assignment with lexicographically ordered acceptance levels T Rihm, P Baumann Journal of Scheduling 21 (2), 167-189, 2018 | 4 | 2018 |
Applications of Mathematical Programming in Personnel Scheduling T Rihm Universität Bern, 2017 | 3 | 2017 |
A decomposition heuristic for short-term planning of assessment centres T Rihm, N Trautmann European journal of industrial engineering 11 (6), 725-751, 2017 | 3 | 2017 |
A lexicographic goal programming approach for staff assignment with acceptance levels T Rihm Multidisciplinary International Conference on Scheduling: Theory and …, 2015 | 3 | 2015 |
A continuous-time MILP formulation for the multi-mode resource-constrained project scheduling problem M Gnägi, T Rihm, N Trautmann 2018 IEEE International Conference on Industrial Engineering and Engineering …, 2018 | 2 | 2018 |
A MIP-based decomposition heuristic for resource-constrained project scheduling T Rihm, N Trautmann 14th International Conference on Project Management and Scheduling, 193-196, 2014 | 2 | 2014 |
An assignment-and sequencing-based mixed-integer linear programming formulation for the resource-constrained project scheduling problem T Rihm, N Trautmann | 1 | 2017 |
A mathematical programming approach for computing the pathwidth of graphs T Rihm 15th Swiss Operations Research Days, Fribourg, 2017, 2017 | | 2017 |
Minimizing operational costs of assessment centers T Rihm International Symposium on Scheduling, Nagoya, 2017, 39-44, 2017 | | 2017 |
A Greedy Heuristic for Artisan Ice Cream Production Scheduling T Rihm 28th Annual POMS Conference, Seattle, 2017, 2017 | | 2017 |
A matheuristic for short-term planning of assessment centers T Rihm European Conference on Operational Research, Poznan, 2016, 2016 | | 2016 |
Operational planning of assessment centers: Matheuristic and performance analysis T Rihm 14th Swiss Operations Research Days, Lugano, 2016, 2016 | | 2016 |
Facets and valid inequalities for the pathwidth problem T Rihm INFORMS Annual Meeting, Nashville, 2016, 2016 | | 2016 |
Planning assessment centers: An MIP-based decomposition heuristic T Rihm 27th Annual POMS Conference, Orlando, 2016 | | 2016 |