עקוב אחר
Meervat R. Altaie
Meervat R. Altaie
עוד שמותDr. Meervat R. Al-taie, MR altaie, Altaie Meervat
University of Baghdad/ college of Engineering/Department of Civil Engneering
כתובת אימייל מאומתת בדומיין coeng.uobaghdad.edu.iq - דף הבית
כותרת
צוטט על ידי
צוטט על ידי
שנה
Investigation the Opportunity of BIM with Agile Management Approach in Iraqi Construction Projects
GA Ahmed, MR Altaie
E3S Web of Conferences 318, 02001, 2021
152021
Using neural network model to estimate the optimum time for repetitive construction projects in Iraq
M Altaie, AM Borhan
Association of Arab Universities Journal of Engineering Sciences 25 (5), 100-114, 2018
92018
Exploring the Factors Affecting the Elemental Cost Estimation with Relationship Analysis Using AHP
HAA dr. Ahmed Mohammed Raoof Mahjoob ,Dr. Mervat Raziq Wali
Journal of Engineering 22 (Number 8), 1-13, 2016
92016
Fundamental challenges and management opportunities in post disaster reconstruction project
MR Altaie, MM Dishar, IF Muhsin
Civil Engineering Journal 9 (9), 2161-2174, 2023
82023
Factors Affecting Building Maintenance Practices: Review
EM Kadhim, MR Altaie
J. Eng 29, 153-172, 2023
62023
Developing systems engineering for sustainable infrastructure projects
KR Obead, MR Wali
IOP conference series: Materials science and engineering 901 (1), 012026, 2020
62020
COST MANAGEMENT AND PLANNING IN CONSTRUCTION PROJECTS
ZMS Meervat Altaie
journal of engineering 15 (4), 775-799, 2009
5*2009
Applying the Analytical Hierarchy Process to Identify the Challenges and Priorities of Reconstruction Projects in Iraq
MR Altaie, MD Dishar
Engineering, Technology & Applied Science Research 14 (1), 12788-12796, 2024
42024
Artificial intelligence based statistical process control for monitoring and quality control of water resources: a complete digital solution
A Emad, S Naimi, MR Altaie, MRA Hameed
International Journal of Intelligent Systems and Applications in Engineering …, 2023
42023
Optimizing methods of funding residential complexes projects
AS Khamees, MR Altaay
International Journal of Intelligent Systems and Applications in Engineering …, 2022
42022
Use risk score method to identify the qualitative risk analysis criteria in tendering phase in construction projects
M Marwa, MR Altaie
Journal of Engineering 28 (7), 31-42, 2022
42022
Evaluating the efficiency of finance methods in residential complex projects in Iraq
AS Khameesa, MR Altaay
Engineering, Technology & Applied Science Research 12 (1), 8080-8084, 2022
42022
Application of nanotechnology in Iraqi construction projects
MW Jumaah, M Altaie
IOP Conference Series: Materials Science and Engineering 901 (1), 012019, 2020
42020
Determining the causes of punching shear in reinforced slabs using fishbone diagram
AM Burhan, MR Altaie, OK Al-Kubaisi
Civil Engineering Journal 4 (11), 2642-2651, 2018
42018
Optimal Indicators to Select the Engineering Consultancy Office For Higher Education Institutions in Iraq
DM altaie
journal of Engineering 23 (9), 45-63, 2017
42017
Integration of Artificial Intelligence Applications and Knowledge Management processes for Construction Projects Management
MMD Meervat R. Altaie
CIVIL ENGINEERING JOURNAL 10 (3), 738-756, 2024
32024
Factors Affecting Maintenance Practises in Iraq’s Hospital Buildings
K Esraa ,M., M Altaie
Jordan Journal of Civil Engineering 17 (3), 408-418, 2023
32023
Identifying failure factors in the implementation of residential complex projects in Iraq
MR Altaie, K Onyelowe
Journal of Engineering 30 (02), 1-15, 2024
22024
Managing the Utilization of Preventive Measures for Fire Resistance in the Hospitals
MR Altaie, IF Muhsin, MM Dishar
Civil and Environmental Engineering 19 (2), 520-531, 2023
22023
Geotechnical Engineering and Sustainable Construction
MO Karkush, D Choudhury
Springer, Singapore, 2022
22022
המערכת אינה יכולה לבצע את הפעולה כעת. נסה שוב מאוחר יותר.
מאמרים 1–20