Benefit evaluation for off‐site production in construction N Blismas, C Pasquire, A Gibb Construction management and Economics 24 (2), 121-130, 2006 | 465 | 2006 |
Target value design: using collaboration and a lean approach to reduce construction cost D Zimina, G Ballard, C Pasquire Construction management and economics 30 (5), 383-398, 2012 | 420 | 2012 |
Constraints to the use of off-site production on construction projects NG Blismas, M Pendlebury, A Gibb, C Pasquire Architectural engineering and design management 1 (3), 153-162, 2005 | 244 | 2005 |
Revolutionize value management: A mode towards sustainability NZ Abidin, CL Pasquire International Journal of Project Management 25 (3), 275-282, 2007 | 231 | 2007 |
Delivering sustainability through value management: Concept and performance overview N Zainul Abidin, CL Pasquire Engineering, Construction and Architectural Management 12 (2), 168-180, 2005 | 194 | 2005 |
Drivers for dynamic brief development in construction AAE Othman, TM Hassan, CL Pasquire Engineering, Construction and Architectural Management 11 (4), 248-258, 2004 | 121 | 2004 |
Considerations for as CL Pasquire, AGF Gibb cс Emerald, 2002 | 112 | 2002 |
Leaner construction through off-site manufacturing CL Pasquire, GE Connolly Proceedings IGLC, Gramado, Brazil, 263-266, 2002 | 107 | 2002 |
Value theory in lean construction J Salvatierra‐Garrido, C Pasquire Journal of Financial Management of Property and construction 16 (1), 8-18, 2011 | 102 | 2011 |
The relationship between the last planner® system and collaborative planning practice in UK construction EI Daniel, C Pasquire, G Dickens, HG Ballard Engineering, construction and architectural management 24 (3), 407-425, 2017 | 100 | 2017 |
Exploring the implementation of the Last Planner® System through IGLC community: twenty one years of experience EI Daniel, C Pasquire, G Dickens Nottingham Trent University, 2015 | 91 | 2015 |
Analysis of factors that drive brief development in construction AAE Othman, TM Hassan, CL Pasquire Engineering, Construction and Architectural Management 12 (1), 69-87, 2005 | 74 | 2005 |
Lean Project Delivery—innovation in integrated design & delivery A Mossman, G Ballard, C Pasquire Architectural Engineering and Design Management, 1-28, 2010 | 69 | 2010 |
What should you really measure if you want to compare prefabrication with traditional construction C Pasquire, A Gibb, N Blismas Proceedings IGLC 13, 481-491, 2005 | 61 | 2005 |
Creating social value within the delivery of construction projects: the role of lean approach EI Daniel, C Pasquire Engineering, construction and architectural management 26 (6), 1105-1128, 2019 | 50 | 2019 |
Exploring value concept through the iglc community: Nineteen years of experience J Salvatierra-Garrido, C Pasquire, L Miron Proceedings for the 20th Annual Conference of the International Group for …, 2012 | 50 | 2012 |
Development of approach to support construction stakeholders in implementation of the last planner system EI Daniel, C Pasquire, G Dickens Journal of management in engineering 35 (5), 04019018, 2019 | 48 | 2019 |
Carbon emission assessment for steel structure based on lean construction process F Fu, J Sun, C Pasquire Journal of Intelligent & Robotic Systems 79, 401-416, 2015 | 47 | 2015 |
The 8th flow-common understanding CL Pasquire Nottingham Trent University, 2012 | 46 | 2012 |
Factors for the adoption of green building specifications in China W Wang, S Zhang, C Pasquire International Journal of Building Pathology and Adaptation 36 (3), 254-267, 2018 | 43 | 2018 |