עקוב אחר
Ou Tang
Ou Tang
Professor of Production Economics
כתובת אימייל מאומתת בדומיין liu.se - דף הבית
כותרת
צוטט על ידי
צוטט על ידי
שנה
Identifying risk issues and research advancements in supply chain risk management
O Tang, SN Musa
International journal of production economics 133 (1), 25-34, 2011
14622011
Supply chain collaboration for sustainability: A literature review and future research agenda
L Chen, X Zhao, O Tang, L Price, S Zhang, W Zhu
International journal of production economics 194, 73-87, 2017
6902017
The relationship between disclosures of corporate social performance and financial performance: Evidences from GRI reports in manufacturing industry
L Chen, A Feldmann, O Tang
International Journal of Production Economics 170, 445-456, 2015
4212015
Manufacturing facility location and sustainability: A literature review and research agenda
L Chen, J Olhager, O Tang
International Journal of Production Economics 149, 154-163, 2014
3182014
Economic lot scheduling problem with returns
O Tang, R Teunter
Production and Operations Management 15 (4), 488-497, 2006
1662006
Identifying competitors through comparative relation mining of online reviews in the restaurant industry
S Gao, O Tang, H Wang, P Yin
International Journal of Hospitality Management 71, 19-32, 2018
1642018
Applying GRI reports for the investigation of environmental management practices and company performance in Sweden, China and India
L Chen, O Tang, A Feldmann
Journal of Cleaner Production 98, 36-46, 2015
1612015
Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing
R Teunter, K Kaparis, O Tang
European journal of operational research 191 (3), 1241-1253, 2008
1522008
Levelized cost of hydrogen for refueling stations with solar PV and wind in Sweden: On-grid or off-grid?
O Tang, J Rehme, P Cerin
Energy 241, 122906, 2022
1452022
Motives and barriers of the remanufacturing industry in China
S Wei, D Cheng, E Sundin, O Tang
Journal of Cleaner Production 94, 340-351, 2015
1372015
Planning and replanning the master production schedule under demand uncertainty
O Tang, RW Grubbström
International journal of production economics 78 (3), 323-334, 2002
1372002
Core (product) Acquisition Management for remanufacturing: a review
S Wei, O Tang, E Sundin
Journal of Remanufacturing 5, 1-27, 2015
1332015
The impact of information transparency on the dynamic behaviour of a hybrid manufacturing/remanufacturing system
O Tang, MM Naim*
International Journal of Production Research 42 (19), 4135-4152, 2004
1312004
Simulated annealing in lot sizing problems
O Tang
International Journal of Production Economics 88 (2), 173-181, 2004
1242004
Dynamic performance of a hybrid inventory system with a Kanban policy in remanufacturing process
L Zhou, MM Naim, O Tang, DR Towill
Omega 34 (6), 585-598, 2006
1182006
Considering stochastic lead times in a manufacturing/remanufacturing system with deterministic demands and returns
O Tang, RW Grubbström
International Journal of Production Economics 93, 285-300, 2005
1142005
An overview of input-output analysis applied to production-inventory systems
RW Grubbstrom, O Tang
Economic Systems Research 12 (1), 3-25, 2000
1132000
Planned lead time determination in a make-to-order remanufacturing system
O Tang, RW Grubbström, S Zanoni
International Journal of Production Economics 108 (1-2), 426-435, 2007
1012007
Dynamic pricing and ordering decision for the perishable food of the supermarket using RFID technology
X Liu, O Tang, P Huang
Asia Pacific Journal of Marketing and Logistics 20 (1), 7-22, 2008
992008
The detailed coordination problem in a two-level assembly system with stochastic lead times
O Tang, RW Grubbström
International journal of production economics 81, 415-429, 2003
912003
המערכת אינה יכולה לבצע את הפעולה כעת. נסה שוב מאוחר יותר.
מאמרים 1–20