Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol P Shahsavand, A Marefat, M Parchamijalal Engineering, Construction and Architectural Management 25 (4), 497-533, 2018 | 131 | 2018 |
Identifying organizational variables affecting project management office characteristics and analyzing their correlations in the Iranian project-oriented organizations of the … MP Jalal, SM Koosha International Journal of Project Management 33 (2), 458-466, 2015 | 107 | 2015 |
4D-BIM dynamic time–space conflict detection and quantification system for building construction projects A Mirzaei, F Nasirzadeh, M Parchami Jalal, Y Zamani Journal of construction engineering and management 144 (7), 04018056, 2018 | 92 | 2018 |
A hybrid SD-DEMATEL approach to develop a delay model for construction projects M Parchami Jalal, S Shoar Engineering, Construction and Architectural Management 24 (4), 629-651, 2017 | 72 | 2017 |
A BIM-based construction claim management model for early identification and visualization of claims M Parchami Jalal, T Yavari Roushan, E Noorzai, M Alizadeh Smart and Sustainable Built Environment 10 (2), 227-257, 2021 | 50 | 2021 |
Modeling cost overrun in building construction projects using the interpretive structural modeling approach: a developing country perspective S Shoar, TW Yiu, S Payan, M Parchamijalal Engineering, Construction and Architectural Management 30 (2), 365-392, 2023 | 48 | 2023 |
A hybrid framework to model factors affecting construction labour productivity: Case study of Iran M Parchami Jalal, S Shoar Journal of Financial Management of Property and Construction 24 (3), 630-654, 2019 | 48 | 2019 |
Root Cause Analysis of the Most Frequent Claims in the Building Industry through the SCoP3E Ishikawa Diagram M Parchami Jalal, E Noorzai, T Yavari Roushan Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2019 | 46 | 2019 |
Integration of project management services for International Engineering, Procurement and Construction projects P Amirtash, M Parchami Jalal, MB Jelodar Built Environment Project and Asset Management 11 (2), 330-349, 2021 | 37 | 2021 |
Model for preparing optimal contracts to prevent or reduce claims in projects M Parchami Jalal, H Moharreri Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2020 | 15 | 2020 |
Identification and analysis of owner-induced problems in design–build project lifecycle M Hoseingholi, MP Jalal Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2017 | 14 | 2017 |
Construction projects risk assessment based on fuzzy AHP AS Gohar, M Khanzadi, MP Jalal, AAS Javid 2009 IEEE Student Conference on Research and Development (SCOReD), 570-573, 2009 | 12 | 2009 |
Fuzzy assessment of causes of time overrun (delays) in Irans dam construction projects P Ghoddosi, M P Jalal, M Hosseinalipour Journal of Applied Sciences 8 (19), 3423-3430, 2008 | 10 | 2008 |
Claim management office maturity model (CMOMM) in project-oriented organizations in the construction industry M Parchamijalal, S Moradi, M Zabihi Shirazi Engineering, Construction and Architectural Management 30 (1), 74-104, 2023 | 9 | 2023 |
Contractual risks of BIM implementation and the proposed contract form for DBB and DB projects A Mahdian, M Parchami Jalal, T Yavari Roushan Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2023 | 9 | 2023 |
The decision matrix approach to dealing with delays in construction projects M Parchamijalal, P Shahsavand Proceedings of the International Conference on Management and Dynamic Economics, 2016 | 8 | 2016 |
Risk analysis in implementing building energy performance projects: hybrid DANP-VIKOR model analysis—a case study in Iran H Naderi, MH Heydari, M Parchami Jalal Buildings 13 (8), 2066, 2023 | 7 | 2023 |
Challenges of the engineering design partnership group in design-build contracts M Parchami Jalal, S Nikkhou, M Hoseingholi Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2020 | 6 | 2020 |
Examination and Classification of the causes of creating delays in construction projects in Iran and comparative analysis techniques delay with SCL protocol M Parchamijalal, P Shahsavand, A Marefat Proceedings of the 11th International Conference of Project Management, 2015 | 5 | 2015 |
Analysis of the causes of contractor’s claims in the DB contracts of underground projects in Iran H Talkhabi, MP Jalal, M Golabchi Tunnelling Underground Space Eng 3 (1), 17-33, 2014 | 5 | 2014 |