フォロー
abdulwahed fazeli
abdulwahed fazeli
PhD student at TMU
確認したメール アドレス: torontomu.ca
タイトル
引用先
引用先
Causal analysis of accidents on construction sites: A hybrid fuzzy Delphi and DEMATEL approach
SR Mohandes, H Sadeghi, A Fazeli, A Mahdiyar, MR Hosseini, ...
Safety science 151, 105730, 2022
962022
An integrated BIM-based approach for cost estimation in construction projects
A Fazeli, MS Dashti, F Jalaei, M Khanzadi
Engineering, Construction and Architectural Management 28 (9), 2828-2854, 2021
782021
BIM-integrated TOPSIS-Fuzzy framework to optimize selection of sustainable building components
A Fazeli, F Jalaei, M Khanzadi, S Banihashemi
International Journal of Construction Management 22 (7), 1240-1259, 2022
662022
Augmented reality in design and construction: thematic analysis and conceptual frameworks
A Hajirasouli, S Banihashemi, R Drogemuller, A Fazeli, SR Mohandes
Construction Innovation 22 (3), 412-443, 2022
602022
Modelling the relationship between digital twins implementation barriers and sustainability pillars: Insights from building and construction sector
AF Kineber, AK Singh, A Fazeli, SR Mohandes, C Cheung, M Arashpour, ...
Sustainable Cities and Society 99, 104930, 2023
362023
Machine learning-integrated 5D BIM informatics: Building materials costs data classification and prototype development
S Banihashemi, S Khalili, M Sheikhkhoshkar, A Fazeli
Innovative infrastructure solutions 7 (3), 215, 2022
312022
Automated 4D BIM development: The resource specification and optimization approach
A Fazeli, S Banihashemi, A Hajirasouli, SR Mohandes
Engineering, Construction and Architectural Management 31 (5), 1896-1922, 2024
162024
Determining the stationary digital twins implementation barriers for sustainable construction projects
SR Mohandes, AK Singh, A Fazeli, S Banihashemi, M Arashpour, ...
Smart and Sustainable Built Environment, 2024
42024
Examining the Barriers to the Adoption of IoT-Based Technologies in Green Buildings
A Rahimian, RR Ahmed, A Fazeli, E Aghdam, A Kumar Singh, M Naji, ...
Journal of Construction Engineering and Management 151 (3), 04024211, 2025
2025
現在システムで処理を実行できません。しばらくしてからもう一度お試しください。
論文 1–9