フォロー
carina pimentel
carina pimentel
Industrial Engineering, University of Minho, Algoritmi, GOVCOPP
確認したメール アドレス: ua.pt
タイトル
引用先
引用先
Implementing TPM supported by 5S to improve the availability of an automotive production line
IM Ribeiro, R Godina, C Pimentel, FJG Silva, JCO Matias
Procedia Manufacturing 38, 1574-1581, 2019
1682019
Implementing lean tools in the manufacturing process of trimmings products
P Neves, FJG Silva, LP Ferreira, T Pereira, A Gouveia, C Pimentel
Procedia Manufacturing 17, 696-704, 2018
1612018
The potential of industrial symbiosis: Case analysis and main drivers and barriers to its implementation
A Neves, R Godina, S G. Azevedo, C Pimentel, J CO Matias
Sustainability 11 (24), 7095, 2019
1262019
Integrated urban freight logistics combining passenger and freight flows–mathematical model proposal
C Pimentel, F Alvelos
Transportation research procedia 30, 80-89, 2018
942018
A practical study of the application of SMED to electron-beam machining in automotive industry
M Martins, R Godina, C Pimentel, FJG Silva, JCO Matias
Procedia Manufacturing 17, 647-654, 2018
912018
A structural literature review of the single minute exchange of die: the latest trends
R Godina, C Pimentel, FJG Silva, JCO Matias
Procedia Manufacturing 17, 783-790, 2018
762018
A TPM strategy implementation in an automotive production line through loss reduction
MDO Dos Reis, R Godina, C Pimentel, FJG Silva, JCO Matias
Procedia Manufacturing 38, 908-915, 2019
692019
Just in Time factory
JLQ Pinto, JCO Matias, C Pimentel, SG Azevedo, K Govindan
Implementation through lean manufacturing tools. Cham: Springer …, 2018
622018
Lean school: an example of industry-university collaboration
AM Gento, C Pimentel, JA Pascual
Production planning & control 32 (6), 473-488, 2021
552021
Shop floor management system in the context of smart manufacturing: a case study
D Torres, C Pimentel, S Duarte
International Journal of Lean Six Sigma 11 (5), 823-848, 2020
512020
Improving preventive maintenance management in an energy solutions company
L Martins, FJG Silva, C Pimentel, RB Casais, R Campilho
Procedia Manufacturing 51, 1551-1558, 2020
502020
Improvement of the statistical process control certainty in an automotive manufacturing unit
R Godina, C Pimentel, FJG Silva, JCO Matias
Procedia Manufacturing 17, 729-736, 2018
402018
Implications of total productive maintenance in psychological sense of ownership
H Pinto, C Pimentel, M Cunha
Procedia-Social and Behavioral Sciences 217, 1076-1082, 2016
362016
The way lean starts–a different approach to introduce lean culture and changing process with people’s involvement
RF Mascarenhas, C Pimentel, MJ Rosa
Procedia Manufacturing 38, 948-956, 2019
352019
Comparing Dantzig–Wolfe decompositions and branch-and-price algorithms for the multi-item capacitated lot sizing problem
CMO Pimentel, FP Alvelos, JM Valerio de Carvalho
Optimization Methods & Software 25 (2), 299-319, 2010
342010
A novel concept of CNC machining center automatic feeder
M Barbosa, FJG Silva, C Pimentel, RM Gouveia
Procedia Manufacturing 17, 952-959, 2018
332018
A systematic literature review and conceptual framework of construction industrialization
S Costa, MS Carvalho, C Pimentel, C Duarte
Journal of Construction Engineering and Management 149 (2), 03122013, 2023
312023
A mathematical model for the container stowage and ship routing problem
A Moura, J Oliveira, C Pimentel
Journal of Mathematical Modelling and Algorithms in Operations Research 12 …, 2013
312013
Development of a suitable project management approach for projects with parallel planning and execution
F Freitas, FJG Silva, R Campilho, C Pimentel, R Godina
Procedia Manufacturing 51, 1544-1550, 2020
282020
Introduction to lean and just-in-time manufacturing
JLQ Pinto, JCO Matias, C Pimentel, SG Azevedo, K Govindan, JLQ Pinto, ...
Just in Time Factory: Implementation Through Lean Manufacturing Tools, 1-4, 2018
282018
現在システムで処理を実行できません。しばらくしてからもう一度お試しください。
論文 1–20