フォロー
Maksat Omarov
タイトル
引用先
引用先
Causes of delay in residential construction projects in Cambodia
S Durdyev, M Omarov, S Ismail
Cogent Engineering 4 (1), 1291117, 2017
2252017
SWOT Analysis of the Cambodian construction industry within the ASEAN economic community
S Durdyev, M Omarov, S Ismail
Proceedings of the 28th IBIMA conference on Vision, 2020
212020
Liquefaction potential and post-liquefaction settlement of saturated clean sands: And effect of geofiber reinforcement
M Omarov
162010
Strain-based assessment of liquefaction and seismic settlement of saturated sand
K Hazirbaba, M Omarow
Cogent Engineering 6 (1), 1573788, 2019
142019
Post-cyclic loading settlement of saturated clean sand
K Hazirbaba, M Omarow
Soil Dynamics and Earthquake Engineering 77, 337-347, 2015
142015
Causes of delay in residential construction projects in Cambodia. Cogent Engineering, 4 (1), 1–12
S Durdyev, M Omarov, S Ismail
92017
Estimation of traffic delay due to U-turns at uncontrolled medians: Case study in Phnom Penh, Cambodia
M Omarov, S Ismail, WNMWM Rani, S Durdyev
Sustainability 14 (1), 118, 2021
62021
Excess pore pressure generation and post-cyclic loading settlement of geofiber-reinforced sand
K Hazirbaba, M Omarow
Gradevinar 70 (1), 11-18, 2018
52018
Causes of delay in residential construction projects in Cambodia. Cogent Engineering, 4 (1), 1291117
S Durdyev, M Omarov, S Ismail
52017
Significant contributors to cost overruns in construction projects of Cambodia, Cogent Engineering 4 (1): 1–10
S Durdyev, M Omarov, S Ismail, M Lim
22017
現在システムで処理を実行できません。しばらくしてからもう一度お試しください。
論文 1–10