Implementing fuzzy TOPSIS on project risk variable ranking S Husin, F Fachrurrazi, M Rizalihadi, M Mubarak Advances in Civil Engineering 2019 (1), 9283409, 2019 | 33 | 2019 |
Mechanical properties of concrete in compression exposed to sulfuric acid M Hasan, S Husin, C Nursaniah Key Engineering Materials 711, 302-309, 2016 | 23 | 2016 |
Risk assessment of resources factor in affecting project time S Husin, A Abdullah, M Riza, M Afifuddin Advances in Civil Engineering 2018 (1), 6896141, 2018 | 17 | 2018 |
THE SUBCONTRACTOR SELECTION PRACTICE USING ANN-MULTILAYER. S Husin International Journal of Technology 8 (4), 2017 | 17 | 2017 |
External risk factors affecting construction costs M Mubarak, S Husin, M Oktaviati AIP Conference Proceedings 1903 (1), 2017 | 15 | 2017 |
Neural network for the standard unit price of the building area S Husin Procedia Engineering 171, 282-293, 2017 | 15 | 2017 |
Analisis Korelasi Faktor Komunikasi Proyek Terhadap Pencapaian Kinerja Waktu di Kota Banda Aceh R Mareno, CZ Oktaviani, S Husin Jurnal Arsip Rekayasa Sipil dan Perencanaan 5 (1), 38-46, 2022 | 10 | 2022 |
The weights detection of multi-criteria by using solver F Fachrurrazi, Y Away, S Husin International Journal of Electrical and Computer Engineering (IJECE) 7 (2 …, 2017 | 9 | 2017 |
The Significance Risk for Factors of Labour, Material, and Equipment on Construction Project Quality S Husin, M Mubarak, F Fachrurrazi Aceh International Journal of Science and Technology 8 (2), 106-113, 2019 | 6 | 2019 |
Practical crash duration estimation for project schedule activities S Husin Journal of King Saud University-Engineering Sciences 33 (1), 1-14, 2021 | 5 | 2021 |
Construction cost impacts related to manpower, material, and equipment factors in contractor firms perspective S Husin, A Abdullah, M Riza, M Afifuddin AIP Conference Proceedings 1903 (1), 2017 | 5 | 2017 |
Kajian Sistem Kontrak Konvensional dan Sistem Performance Based Contract (PBC) pada proyek pemeliharaan Jalan N Malahayati, S Husin, A Mursalin Prosiding Seminar Reguler Seri 1, 2009 | 5 | 2009 |
Critical factors affecting quality performance in construction projects A Rauzana, S Husin, DA Usni International Journal of Management and Administrative Sciences (IJMAS) 6 (3 …, 2018 | 4 | 2018 |
Project risk patterns: a comparison across three periods F Fachrurrazi, S Husin, M Mahmuddin International Journal on Advanced Science, Engineering and Information …, 2018 | 4 | 2018 |
The dynamic properties behavior of high strength concrete under different strain rate H Abdullah, S Husin, H Umar, S Rizal Third International Conference on Experimental Mechanics and Third …, 2005 | 4 | 2005 |
Multiple Regression Analysis to The Influence of Communication Management on Project Success DR Ibdayanti, CZ Oktaviani, S Husin E3S Web of Conferences 476, 01001, 2024 | 3 | 2024 |
Analisis Frekuensi Risiko Proyek Konstruksi Gedung Pada Faktor–Faktor Sumber Daya TY Ariska, M Mubarak, S Husin Journal of The Civil Engineering Student 4 (2), 176-182, 2022 | 3 | 2022 |
Risk impact on cost and time from the factors of contractor’s managerial and operational S Husin, M Riza, M Afifuddin IOP Conference Series: Materials Science and Engineering 523 (1), 012042, 2019 | 3 | 2019 |
Analysis of the risk impact of internal factors on time in building construction projects in Aceh Province TY Ariska, M Mubarak, S Husin, F Maulina, M Mahmuddin AIP Conference Proceedings 3082 (1), 2024 | 2 | 2024 |
Kepentingan Relatif Faktor-Faktor Integrasi Manajemen Komunikasi Pada Proyek Konstruksi di Banda Aceh DR Ibdayanti, CZ Oktavani, S Husin JMTS: Jurnal Mitra Teknik Sipil, 39-48, 2023 | 2 | 2023 |