フォロー
Zeynep ISIK
タイトル
引用先
引用先
Impact of corporate strengths/weaknesses on project management competencies
Z Isik, D Arditi, I Dikmen, MT Birgonul
International Journal of Project Management 27 (6), 629-637, 2009
1852009
Impact of resources and strategies on construction company performance
Z Isik, D Arditi, I Dikmen, MT Birgonul
Journal of Management in Engineering 26 (1), 9-18, 2010
1162010
Building information modeling (BIM) use in Turkish construction industry
H Aladag, G Demirdögen, Z Isık
Procedia engineering 161, 174-179, 2016
1092016
The effect of stakeholder-associated risks in mega-engineering projects: A case study of a PPP airport project
H Aladağ, Z Işik
IEEE Transactions on Engineering Management 67 (1), 174-186, 2018
882018
An overarching review on delay analyses in construction projects
M Çevikbaş, Z Işık
Buildings 11 (3), 109, 2021
682021
Role of financial risks in BOT megatransportation projects in developing countries
H Aladağ, Z Işik
Journal of Management in Engineering 33 (4), 04017007, 2017
622017
Exploring the additional value of class imbalance distributions on interpretable flash flood susceptibility prediction in the Black Warrior River basin, Alabama, United States
Ö Ekmekcioğlu, K Koc, M Özger, Z Işık
Journal of Hydrology 610, 127877, 2022
512022
The role of exogenous factors in the strategic performance of construction companies
Z Isik, D Arditi, I Dilmen, M Talat Birgonul
Engineering, Construction and Architectural Management 17 (2), 119-134, 2010
502010
A fuzzy AHP model to assess sustainable performance of the construction industry from urban regeneration perspective
Z Işik, H Aladağ
Journal of civil engineering and management 23 (4), 499-509, 2017
482017
Design and construction risks in BOT type mega transportation projects
H Aladağ, Z Işık
Engineering, Construction and Architectural Management 26 (10), 2223-2242, 2019
442019
BIM-based big data analytic system for healthcare facility management
G Demirdöğen, Z Işık, Y Arayici
Journal of Building Engineering 64, 105713, 2023
392023
Lean based maturity framework integrating value, BIM and big data analytics: evidence from AEC industry
G Demirdöğen, NS Diren, H Aladağ, Z Işık
Sustainability 13 (18), 10029, 2021
342021
A multi-agent-based model for sustainable governance of urban flood risk mitigation measures
K Koc, Z Işık
Natural Hazards 104, 1079-1110, 2020
332020
Lean management framework for healthcare facilities integrating BIM, BEPS and big data analytics
G Demirdöğen, Z Işık, Y Arayici
Sustainability 12 (17), 7061, 2020
322020
Developing a probabilistic decision-making model for reinforced sustainable supplier selection
K Koc, Ö Ekmekcioğlu, Z Işık
International Journal of Production Economics 259, 108820, 2023
272023
A conceptual performance measurement framework for construction industry
Z Işik
Fen Bilimleri Enstitüsü, 2009
252009
Assessment of urban flood risk factors using Monte Carlo analytical hierarchy process
K Koc, Z Işık
Natural Hazards Review 22 (4), 04021048, 2021
202021
Facility management information taxonomy framework for queries in healthcare buildings
G Demirdöğen, Z Işık, Y Arayici
Journal of Building Engineering 44, 102510, 2021
182021
Identification and assessment of disruption claim management risks in construction projects: a life cycle-based approach
M Cevikbas, O Okudan, Z Işık
Engineering, Construction and Architectural Management 31 (1), 1-27, 2024
162024
Determination of business intelligence and analytics-based healthcare facility management key performance indicators
G Demirdöğen, Z Işık, Y Arayici
Applied Sciences 12 (2), 651, 2022
162022
現在システムで処理を実行できません。しばらくしてからもう一度お試しください。
論文 1–20