フォロー
Dr. Ka-Chi LAM
タイトル
引用先
引用先
Large construction projects in developing countries: a case study from Vietnam
ND Long, S Ogunlana, T Quang, KC Lam
International Journal of project management 22 (7), 553-561, 2004
6272004
Modelling risk allocation decision in construction contracts
KC Lam, D Wang, PTK Lee, YT Tsang
International journal of project management 25 (5), 485-493, 2007
4982007
River flow time series prediction with a range-dependent neural network
TS Hu, KC Lam, ST Ng
Hydrological Sciences Journal 46 (5), 729-745, 2001
2122001
Demotivating factors influencing the productivity of civil engineering projects
ST Ng, RM Skitmore, KC Lam, AWC Poon
International journal of project Management 22 (2), 139-146, 2004
2102004
Dynamic construction site layout planning using max-min ant system
X Ning, KC Lam, MCK Lam
Automation in construction 19 (1), 55-65, 2010
2062010
A decision-making system for construction site layout planning
X Ning, KC Lam, MCK Lam
Automation in construction 20 (4), 459-473, 2011
1732011
A material supplier selection model for property developers using fuzzy principal component analysis
KC Lam, R Tao, MCK Lam
Automation in Construction 19 (5), 608-618, 2010
1692010
A Fuzzy Neural Network Approach for Contractor Pre-qualification
K.C. Lam, T.S. Hu, S.T. Ng, Martin Skitmore, and S.O. Cheung
Construction Management ad Economics 19 (2), 175-188, 2001
151*2001
Fuzzy membership functions of procurement selection criteria
ST Ng, DT Luu, SE Chen, KC Lam
Construction Management & Economics 20 (3), 285-296, 2002
1422002
The predictive ability of Bromilow's timecost model
S Thomas Ng, MMY Mak, R Martin Skitmore, KC Lam, M Varnam
Construction management and Economics 19 (2), 165-173, 2001
1202001
A support vector machine model for contractor prequalification
KC Lam, E Palaneeswaran, C Yu
Automation in Construction 18 (3), 321-329, 2009
1152009
Decision support system for contractor pre‐qualification—artificial neural network model
KC Lam, ST Ng, H Tiesong, M Skitmore, SO Cheung
Engineering Construction and Architectural Management 7 (3), 251-266, 2000
1122000
Improving objectivity in procurement selection
SO Cheung, TI Lam, YW Wan, KC Lam
Journal of Management in Engineering 17 (3), 132-139, 2001
1082001
The application of the ant colony optimization algorithm to the construction site layout planning problem
KC Lam, X Ning, T Ng
Construction management and economics 25 (4), 359-374, 2007
1072007
Analytical and numerical study on the pillar rockbursts mechanism
SY Wang, KC Lam, SK Au, CA Tang, WC Zhu, TH Yang
Rock Mechanics and Rock Engineering 39, 445-467, 2006
1012006
A Satisfying Leadership Behaviour Model for Design Consultants
S.O. Cheung, S.T. Ng, K.C. Lam, and W.M. Yue
International Journal of Project Management 19, 421-429, 2001
932001
Understanding the effect of the learning–forgetting phenomenon to duration of projects construction
KC Lam, D Lee, T Hu
International Journal of Project Management 19 (7), 411-420, 2001
892001
A modified neural network for improving river flow prediction/Un Réseau de Neurones Modifié pour Améliorer la Prévision de L'Écoulement Fluvial
TS Hu, KC Lam, ST Ng
Hydrological sciences journal 50 (2), 2005
852005
Nigeria’s construction industry: Barriers to effective communication
OA Ejohwomu, OS Oshodi, KC Lam
Engineering, Construction and Architectural Management 24 (4), 652-667, 2017
832017
A novel artificial neural network fire model for prediction of thermal interface location in single compartment fire
EWM Lee, RKK Yuen, SM Lo, KC Lam, GH Yeoh
Fire Safety Journal 39 (1), 67-87, 2004
832004
現在システムで処理を実行できません。しばらくしてからもう一度お試しください。
論文 1–20