Reliability analysis of communication network system with redundant relay station under partial and complete failure I Yusuf, AL Ismail, UA Ali J. Math. Comput. Sci. 10 (4), 863-880, 2020 | 37 | 2020 |
Performance analysis of multi-computer system consisting of three subsystems in series configuration using copula repair policy I Yusuf, AL Ismail, VV Singh, UA Ali, NA Sufi SN Computer Science 1, 1-11, 2020 | 35 | 2020 |
An optimal assignment schedule of staff-subject allocation S Kabiru, BM Saidu, AZ Abdul, UA Ali Journal of Mathematical Finance 7 (04), 805, 2017 | 22 | 2017 |
Reliability analysis of multi-workstation computer network configured as series-parallel system via gumbel—hougaard family copula MS Isa, I Yusuf, UA Ali, K Suleiman, B Yusuf, AL Ismail International Journal of Operations Research 19 (1), 13-26, 2022 | 16 | 2022 |
Reliability modelling and analysis of client–server system using Gumbel–Hougaard family copula I Yusuf, AL Ismail, MA Lawan, UA Ali, S Nasir Life Cycle Reliability and Safety Engineering, 1-14, 2021 | 16 | 2021 |
Stochastic analysis and performance evaluation of a complex thermal power plant K Suleiman, UA Ali, I Yusuf Innovative Systems Design and Engineering 4 (15), 21-32, 2013 | 16 | 2013 |
Structural dependence replacement model for parallel system of two units I Yusuf, UA Ali Nigerian journal of basic and applied sciences 20 (4), 324-326, 2012 | 16 | 2012 |
Stochastic modelling and analysis of a repairable 2-out-of-4 system I Yusuf, K Suleiman, Y Bashir, UA Ali International Journal of Mathematics in Operational Research 6 (1), 29-40, 2014 | 14 | 2014 |
Comparison between four dissimilar solar panel configurations K Suleiman, UA Ali, I Yusuf, AD Koko, SI Bala Journal of Industrial Engineering International 13, 479-486, 2017 | 11 | 2017 |
Comparison of Transportation Algorithms Using Data from Katsina State Transport Authority, Katsina State, Nigeria UA Ali, AM Mustapha Nigerian Journal of Basic and Applied Sciences 21 (3), 207-214, 2013 | 9 | 2013 |
Performance analysis of multi computer system consisting of active parallel homogeneous clients I Yusuf, A Sanusi, AL Ismail, MS Isa, S Bala, UA Ali Annals of Optimization Theory and Practice 3 (2), 1-24, 2020 | 8 | 2020 |
Availability and profit optimization of series-parallel system with linear consecutive cold standby units MS Aliyu, I Yusuf, UA Ali Applied Mathematics 6 (02), 332, 2015 | 8 | 2015 |
Availability evaluation of repairable system requiring two types of supporting device for operations NJ Fagge, I Yusuf, UA Ali International Journal of Applied Mathematical Research 6 (1), 14-19, 2017 | 7 | 2017 |
Modelling the reliability and availability characteristics of a system with three stages of deterioration I Yusuf, K Suleiman, SI Bala, UA Ali International Journal of Science and Technology 1 (7), 329-337, 2012 | 7 | 2012 |
Series‐Parallel Computer System Performance Evaluation with Human Operator Using Gumbel‐Hougaard Family Copula MS Isa, I Yusuf, UA Ali, W Jinbiao Computational Intelligence in Sustainable Reliability Engineering, 109-127, 2023 | 6 | 2023 |
Reliability analysis of a two dissimilar unit cold standby system with three modes using Kolmogorov forward equation method UA Ali, NI Bala, I Yusuf Nigerian Journal of Basic and Applied Sciences 21 (3), 197-206, 2013 | 5 | 2013 |
Reliability analysis of distribution transformer: a case study of gwiwa business unit, sokoto K Sulaiman, U Ali Greener J. Sci. Eng. Technol. Res 3 (2), 88-92, 2013 | 4 | 2013 |
Reliability and performance analysis of two unit active parallel system attended by two repairable machines MA Lawan, UA Ali, AL Ismal, MS Isa, AS Maihulla, I Yusuf International Journal of Operations Research 19 (2), 27-40, 2022 | 3 | 2022 |
Analysis of mean time to system failure and availability of a system with cold standby unit MU Danjuma, B Yusuf, UA Ali, AL Ismail, S Soltani, FM Sobhani J Ind Eng Int 18 (1), 2, 2022 | 3 | 2022 |
Cost–benefit analysis of three different series–parallel dynamo configurations MS Isa, UA Ali, B Yusuf, I Yusuf Life cycle reliability and safety engineering 9, 413-423, 2020 | 3 | 2020 |