팔로우
Masoud Zavari
제목
인용
인용
연도
Multi-objective optimization of dynamic construction site layout using BIM and GIS
M Zavari, V Shahhosseini, A Ardeshir, MH Sebt
Journal of Building Engineering 52, 104518, 2022
372022
The effects of bim maturity level on the 4d simulation performance: An empirical study
HM Dadashi, H Taghaddos, MH Sebt, F Chokan, M Zavari
INTERNATIONAL JOURNAL OF ENGINEERING 34 (3), 606-614, 2021
142021
The role of site manager transformational leadership in the construction project success
M Zavari, MR Afshar
International Journal of Building Pathology and Adaptation 41 (5), 1067-1085, 2023
122023
BIM-based estimation of inputs for site layout planning and locating irregularly shaped facilities
M Zavari, V Shahhosseini, A Ardeshir, MH Sebt
Automation in Construction 141, 104431, 2022
62022
Imperialist competitive algorithm for subcontractor selection in multiple project environments
MR Afshar, M Zavari
Soft Computing 28 (3), 2107-2124, 2024
42024
Developing a fuzzy expert system to determine the levels of students' eHealth literacy
R Eskrootchi, M Zavari, M Alibeyk
Library Philosophy and Practice, 1-26, 2021
42021
BARRIERS TO NEW TECHNOLOGY DISSEMINATION IN THE CONSTRUCTION INDUSTRY
M ZAVARI, MM MORTAHEB, H KASHANI
2016
현재 시스템이 작동되지 않습니다. 나중에 다시 시도해 주세요.
학술자료 1–7