Location-based management for construction: Planning, scheduling and control R Kenley, O Seppänen Routledge, 2006 | 435 | 2006 |
The combination of last planner system and location-based management system O Seppänen, G Ballard, S Pesonen Lean construction journal, 43-54, 2010 | 269 | 2010 |
Comparison between location based management and takt time planning AG Frandson, O Seppänen, ID Tommelein 23rd annual conference of the international group for lean construction, 3-12, 2015 | 132 | 2015 |
Location-based management of construction projects: Part of a new typology for project scheduling methodologies R Kenley, O Seppänen Proceedings of the 2009 Winter Simulation Conference (WSC), 2563-2570, 2009 | 124 | 2009 |
Empirical research on the success of production control in building construction projects O Seppänen Teknillinen korkeakoulu, 2009 | 121 | 2009 |
Direct digital construction: Technology-based operations management practice for continuous improvement of construction industry performance M Tetik, A Peltokorpi, O Seppänen, J Holmström Automation in construction 107, 102910, 2019 | 111 | 2019 |
Real-time resource tracking for analyzing value-adding time in construction J Zhao, O Seppänen, A Peltokorpi, B Badihi, H Olivieri Automation in Construction 104, 52-65, 2019 | 108 | 2019 |
Construction flow index: a metric of production flow quality in construction R Sacks, O Seppänen, V Priven, J Savosnick Construction management and economics 35 (1-2), 45-63, 2017 | 108 | 2017 |
Categorizing modularization strategies to achieve various objectives of building investments A Peltokorpi, H Olivieri, AD Granja, O Seppänen Construction management and economics 36 (1), 32-48, 2018 | 97 | 2018 |
A shared ontology suite for digital construction workflow Y Zheng, S Törmä, O Seppänen Automation in Construction 132, 103930, 2021 | 88 | 2021 |
Effects of the location-based management system on production rates and productivity O Seppänen, J Evinger, C Mouflard Construction management and economics 32 (6), 608-624, 2014 | 88 | 2014 |
Survey comparing critical path method, last planner system, and location-based techniques H Olivieri, O Seppänen, TCL Alves, NM Scala, V Schiavone, M Liu, ... Journal of construction engineering and management 145 (12), 04019077, 2019 | 80 | 2019 |
Improving workflow and resource usage in construction schedules through location-based management system (LBMS) H Olivieri, O Seppänen, A Denis Granja Construction management and economics 36 (2), 109-124, 2018 | 74 | 2018 |
How takt production contributes to construction production flow: a theoretical model J Lehtovaara, O Seppänen, A Peltokorpi, P Kujansuu, M Grönvall Construction management and economics 39 (1), 73-95, 2021 | 68 | 2021 |
Takt time planning in cruise ship cabin refurbishment: Lessons for lean construction A Heinonen, O Seppänen Proc. 24th Ann. Conf. of the Int’l. Group for Lean Construction, IGLC …, 2016 | 66* | 2016 |
A new perspective of construction logistics and production control: An exploratory study M Ghanem, F Hamzeh, O Seppänen, E Zankoul Annual Conference of the International Group for Lean Construction, 992-1001, 2018 | 62 | 2018 |
A comparison of takt time and LBMS planning methods O Seppänen Annual Conference of the International Group for Lean Construction, 2014 | 61 | 2014 |
A case study of line-of-balance based schedule planning and control system O Seppänen, E Aalto Proceedings of the 13th Annual Conference of the International Group for …, 2005 | 57 | 2005 |
Integration of last planner system and location-based management system O Seppänen, RU Modrich, G Ballard 23rd Annual Conference of the International Group for Lean Construction, 123-132, 2015 | 54 | 2015 |
Implementation of line-of-balance based scheduling and project control system in a large construction company M Soini, I Leskelä, O Seppänen Proceedings of the 12th Annual Conference of the International Group for …, 2004 | 54 | 2004 |