팔로우
Olli Seppänen
Olli Seppänen
다른 이름Olli Seppanen
aalto.fi의 이메일 확인됨
제목
인용
인용
연도
Location-based management for construction: Planning, scheduling and control
R Kenley, O Seppänen
Routledge, 2006
4352006
The combination of last planner system and location-based management system
O Seppänen, G Ballard, S Pesonen
Lean construction journal, 43-54, 2010
2692010
Comparison between location based management and takt time planning
AG Frandson, O Seppänen, ID Tommelein
23rd annual conference of the international group for lean construction, 3-12, 2015
1322015
Location-based management of construction projects: Part of a new typology for project scheduling methodologies
R Kenley, O Seppänen
Proceedings of the 2009 Winter Simulation Conference (WSC), 2563-2570, 2009
1242009
Empirical research on the success of production control in building construction projects
O Seppänen
Teknillinen korkeakoulu, 2009
1212009
Direct digital construction: Technology-based operations management practice for continuous improvement of construction industry performance
M Tetik, A Peltokorpi, O Seppänen, J Holmström
Automation in construction 107, 102910, 2019
1112019
Real-time resource tracking for analyzing value-adding time in construction
J Zhao, O Seppänen, A Peltokorpi, B Badihi, H Olivieri
Automation in Construction 104, 52-65, 2019
1082019
Construction flow index: a metric of production flow quality in construction
R Sacks, O Seppänen, V Priven, J Savosnick
Construction management and economics 35 (1-2), 45-63, 2017
1082017
Categorizing modularization strategies to achieve various objectives of building investments
A Peltokorpi, H Olivieri, AD Granja, O Seppänen
Construction management and economics 36 (1), 32-48, 2018
972018
A shared ontology suite for digital construction workflow
Y Zheng, S Törmä, O Seppänen
Automation in Construction 132, 103930, 2021
882021
Effects of the location-based management system on production rates and productivity
O Seppänen, J Evinger, C Mouflard
Construction management and economics 32 (6), 608-624, 2014
882014
Survey comparing critical path method, last planner system, and location-based techniques
H Olivieri, O Seppänen, TCL Alves, NM Scala, V Schiavone, M Liu, ...
Journal of construction engineering and management 145 (12), 04019077, 2019
802019
Improving workflow and resource usage in construction schedules through location-based management system (LBMS)
H Olivieri, O Seppänen, A Denis Granja
Construction management and economics 36 (2), 109-124, 2018
742018
How takt production contributes to construction production flow: a theoretical model
J Lehtovaara, O Seppänen, A Peltokorpi, P Kujansuu, M Grönvall
Construction management and economics 39 (1), 73-95, 2021
682021
Takt time planning in cruise ship cabin refurbishment: Lessons for lean construction
A Heinonen, O Seppänen
Proc. 24th Ann. Conf. of the Int’l. Group for Lean Construction, IGLC …, 2016
66*2016
A new perspective of construction logistics and production control: An exploratory study
M Ghanem, F Hamzeh, O Seppänen, E Zankoul
Annual Conference of the International Group for Lean Construction, 992-1001, 2018
622018
A comparison of takt time and LBMS planning methods
O Seppänen
Annual Conference of the International Group for Lean Construction, 2014
612014
A case study of line-of-balance based schedule planning and control system
O Seppänen, E Aalto
Proceedings of the 13th Annual Conference of the International Group for …, 2005
572005
Integration of last planner system and location-based management system
O Seppänen, RU Modrich, G Ballard
23rd Annual Conference of the International Group for Lean Construction, 123-132, 2015
542015
Implementation of line-of-balance based scheduling and project control system in a large construction company
M Soini, I Leskelä, O Seppänen
Proceedings of the 12th Annual Conference of the International Group for …, 2004
542004
현재 시스템이 작동되지 않습니다. 나중에 다시 시도해 주세요.
학술자료 1–20