Efficient stochastic hybrid heuristics for the multi-depot vehicle routing problem M Mirabi, SMTF Ghomi, F Jolai Robotics and Computer-Integrated Manufacturing 26 (6), 564-569, 2010 | 129 | 2010 |
A two-stage hybrid flowshop scheduling problem in machine breakdown condition M Mirabi, SMTF Ghomi, F Jolai Journal of Intelligent Manufacturing 24, 193-199, 2013 | 50 | 2013 |
Ant colony optimization technique for the sequence-dependent flowshop scheduling problem M Mirabi The International Journal of Advanced Manufacturing Technology 55, 317-326, 2011 | 49 | 2011 |
A novel hybrid genetic algorithm to solve the sequence-dependent permutation flow-shop scheduling problem M Mirabi The International Journal of Advanced Manufacturing Technology 71 (1), 429-437, 2014 | 32 | 2014 |
Modeling and solving the multi-depot vehicle routing problem with time window by considering the flexible end depot in each route M Mirabi, N Shokri, A Sadeghieh International Journal of Supply and Operations Management 3 (3), 1373, 2016 | 28 | 2016 |
A hybrid electromagnetism algorithm for multi-depot periodic vehicle routing problem M Mirabi The International Journal of Advanced Manufacturing Technology 71 (1), 509-518, 2014 | 26 | 2014 |
A novel hybrid genetic algorithm for the multidepot periodic vehicle routing problem M Mirabi AI EDAM 29 (1), 45-54, 2015 | 21 | 2015 |
A hybrid simulated annealing for the single-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times and costs and dynamic release of jobs M Mirabi The International Journal of Advanced Manufacturing Technology 54, 1109-1119, 2011 | 17 | 2011 |
Hybrid ant colony optimization for capacitated multiple-allocation cluster hub location problem M Mirabi, P Seddighi AI EDAM 32 (1), 44-58, 2018 | 13 | 2018 |
A hybrid electromagnetism-like algorithm for supplier selection in make-to-order planning M Mirabi, GSMT FATEMI, F JOULAI SCIENTIA IRANICA 17 (1), 1-11, 2010 | 13 | 2010 |
A novel hybrid genetic algorithm to solve the make-to-order sequence-dependent flow-shop scheduling problem M Mirabi, SMT Fatemi Ghomi, F Jolai Journal of Industrial Engineering International 10, 1-9, 2014 | 12 | 2014 |
Hybrid electromagnetism-like algorithm for the flowshop scheduling with sequence-dependent setup times M Zandieh, F Jolai, SMT Fatemi Gho, M Mirabi Journal of Applied Sciences 8 (20), 3621-3629, 2008 | 12 | 2008 |
Ranking of leagility factors based on job satisfaction through a combinatory model of fuzzy TOPSIS and AHP (case study: MRI Hospital, Shiraz, Iran) HD Denavi, M Mirabi, A Rezaei Open Journal of Business and Management 6 (01), 21, 2017 | 8 | 2017 |
Ranking and evaluating the factors affecting the success of management team in construction projects MB Zare, A Mirjalili, M Mirabi Journal of Fundamental and Applied Sciences 8 (3), 614-630, 2016 | 7 | 2016 |
Solving NP hard problems using a new genetic algorithm MA Ebrahimi, H Dehghan Dehnavi, M Mirabi, MT Honari, A Sadeghian International Journal of Nonlinear Analysis and Applications 14 (1), 275-285, 2023 | 5 | 2023 |
Analysing acceptance sampling plans by Markov chains M Mirabi, MS Fallahnezhad South African Journal of Industrial Engineering 23 (1), 151-161, 2012 | 5 | 2012 |
Optimization Portfolio Selection in Risk Situations with Combined Meta-Heuristic Algorithm of Genetic Algorithm (GA) and Lion Optimization Algorithm (LOA) M Mirabi, M Zarei Mahmoudabadi Financial Management Perspective 10 (32), 33-56, 2020 | 4 | 2020 |
A hybrid genetic algorithm for the sequence dependent flow-shop scheduling problem M Mirabi World Academy of Science, Engineering and Technology 5 (7), 1364-1370, 2011 | 4 | 2011 |
Impact of supply chain management and agile supply chain on customer satisfaction and competitive advantage M Mirabi, AS Hatami, S Karamad International Journal of Engineering and Technology 10 (4), 995-1004, 2018 | 3 | 2018 |
Mathematical modeling and solving a hub location-allocation problem in Iranian airports M Mirabi, H Ghiyasvand-Mohammadkhani, R Tavakkoli-Moghaddam Quarterly Journal of Transportation Engineering, 2019 | 2 | 2019 |