Stebėti
Dr. Ing. Helmut Wannenmacher
Dr. Ing. Helmut Wannenmacher
Implenia Construction GmbH
Patvirtintas el. paštas a1.net
Pavadinimas
Cituota
Cituota
Metai
Underground excavation behaviour of the Queenston formation: tunnel back analysis for application to shaft damage dimension prediction
MA Perras, H Wannenmacher, MS Diederichs
Rock Mechanics and Rock Engineering 48, 1647-1671, 2015
362015
Investigating High-Strength Expanded Polystyrene (HS-EPS) as yielding support elements for tunnelling in squeezing ground conditions
M Entfellner, P Hamdi, X Wang, H Wannenmacher, F Amann
Tunnelling and Underground Space Technology 140, 105261, 2023
122023
RETRACTED: Investigating high-strength expanded polystyrene (HS-EPS) as yielding support elements for tunnelling in squeezing ground conditions
M Entfellner, P Hamdi, X Wang, H Wannenmacher, F Amann
Tunnelling and Underground Space Technology 118, 104186, 2021
92021
Water ingress and reduction measures in the headrace tunnel at the Uma Oya multipurpose project
H Wannenmacher, AH Hosseini, D Wenner, A Rahbar, Z Shahrokhi
Hydro 2016, 1-6, 2016
82016
Improved pressure tunnel lining methods
H Wannenmacher, H Krenn, M Bauert, N Komma, F Engel
Underground–the way to the future, 2013
72013
The Niagara Tunnel Facility Project–Technical and economical aspects of passive prestressed pressure tunnels
H Wannenmacher
Swiss Tunnel Congress. Lucerne, 2012
72012
Technical challenges during construction of Alborz service tunnel, Iran
D Wenner, H Wannenmacher
Geomechanik und Tunnelbau: Geomechanik und Tunnelbau 1 (6), 537-542, 2008
62008
Drilling and grouting works for pressurised groundwater conditions of the semmering base tunnel
H Wannenmacher, M Entfellner, H Hauer
Geotechnical and Geological Engineering 40 (9), 4377-4391, 2022
52022
Improved pressure tunnel lining methods, a case study of the Niagara Tunnel Facility Project
H Wannenmacher, M Bauert, H Krenn, F Engel, N Komma
World Tunnel Congress, 2013
52013
The influence of rock and rock mass properties towards prediction of TBM penetration rates
H Wannenmacher, R Fuentes Gutierrez, F Amann, M Perras, T Marcher
Lehrstuhl für Ingenieurgeologie und Hydrogeologie, 2024
42024
The assessment of intact rock strength for penetration
H Wannenmacher, P Hamdi, F Amann, T Marcher, T Frühwirt
Expanding Underground-Knowledge and Passion to Make a Positive Impact on the …, 2023
42023
Operational analyses of pressure tunnel and shaft grouting operations
H Wannenmacher, A Heizmann, S Sabew
EUROCK 2015 & 64th Geomechanics Colloquium, 6, 2015
42015
Rock mechanical aspects for cavern stability
T Pilgerstorfer, H Wannenmacher, K Grossauer, A Stucki, B Schwegler
ISRM EUROCK, ISRM-EUROCK-2013-018, 2013
42013
Improved monitoring systems for pre‐stressing of water tunnels/Weiterentwicklung der Vermessungssysteme für Vorspanninjektionen von Wasserstollen
H Krenn, N Komma, H Wannenmacher
Geomechanics and Tunnelling 4 (5), 605-607, 2011
42011
Advancing tbm performance: Integrating shield friction analysis and machine learning in geotechnical engineering
M Schlicke, H Wannenmacher, K Nübel
Geotechnics 4 (1), 194-208, 2024
32024
Demands on digital data capturing of TBM and conventional tunnel drives
N Sabanovic, H Wannenmacher, F Stauch, W Fentzloff
Geomechanics and Tunnelling 15 (2), 207-214, 2022
32022
Baulos SBT3. 1: Bohr-/und Injektionsarbeiten für den Schacht Sommerau 2
H Wannenmacher, R Pfeffer, A Walter, B Christöphl
ÖGG Spezialseminar Injektionen, https://s3. nl-ams. scw. cloud/assets. oegg …, 2017
32017
Geotechnical observations from the Niagara Tunnel Project: Numerical back analysis for application to shaft damage dimension prediction
MA Perras, MS Diederichs, H Wannenmacher
Austrian Society for Geomechanics, Annual Congress, 2015
32015
Back analysis of rock mass behavior of the Quintner Limestone at the Gonzen mine near Sargans, Switzerland
MA Perras, E Ghazvinian, MS Diederichs, F Amann, H Wannenmacher
ISRM EUROCK, ISRM-EUROCK-2013-072, 2013
32013
Deformation measurement and long‐term behaviour of passively prestressed pressure tunnels through the example of the Niagara Tunnel Facility Project/Verformungsmessung und …
H Krenn, M Roner, M Bauert, H Wannenmacher
Geomechanics and Tunnelling 6 (5), 398-406, 2013
32013
Sistema negali atlikti operacijos. Bandykite vėliau dar kartą.
Straipsniai 1–20