A constraint-based approach for the Shift Design Personnel Task Scheduling Problem with equity T Lapègue, O Bellenguez-Morineau, D Prot Computers & Operations Research 40 (10), 2450–2465, 2013 | 55 | 2013 |
A survey on how the structure of precedence constraints may change the complexity class of scheduling problems D Prot, O Bellenguez-Morineau Journal of Scheduling 21 (1), 3-16, 2018 | 41 | 2018 |
A two-phase method for the Shift Design and Personnel Task Scheduling Problem with Equity objective D Prot, T Lapegue, O Bellenguez-Morineau International Journal of Production Research 53 (24), 7286-7298, 2015 | 38 | 2015 |
New complexity results for parallel identical machine scheduling problems with preemption, release dates and regular criteria D Prot, O Bellenguez-Morineau, C Lahlou European Journal of Operational Research 231 (2), 282-287, 2013 | 29 | 2013 |
Tabu search and lower bound for an industrial complex shop scheduling problem D Prot, O Bellenguez-Morineau Computers & Industrial Engineering 62 (4), 1109-1118, 2012 | 16 | 2012 |
The scheduling zoo C Dürr, S Knust, D Prot, ÓC Vásquez URL http://www-desir. lip6. fr/~ durrc/query, 2013 | 13 | 2013 |
A Tour Scheduling Problem with Fixed Jobs: use of Constraint Programming T Lapègue, D Prot, O Bellenguez-Morineau Practice and Theory of Automated Timetabling, 2012 | 11 | 2012 |
A note on {\ mathbb {NP}}-hardness of preemptive mean flow-time scheduling for parallel machines O Bellenguez-Morineau, M Chrobak, C Dürr, D Prot Journal of Scheduling 18 (3), 299-304, 2015 | 9 | 2015 |
Approximations for the Two-Machine Cross-Docking Flow Shop Problem D Prot, C Rapine Discrete Applied Mathematics 161 (13-14), 2107-2119, 2013 | 9 | 2013 |
Using graph concepts to assess the feasibility of a sequenced air traffic flow with low conflict rate D Prot, C Rapine, S Constans, R Fondacci European Journal of Operational Research 207 (1), 184-196, 2010 | 8 | 2010 |
A 4D-sequencing approach for Air Traffic Management D Prot, C Rapine, S Constans, R Fondacci European Journal of Operational Research 237 (2), 411-425, 2014 | 7 | 2014 |
Overview on methods for the Shift Design and Personnel Task Scheduling Problem with Equity objective T Lapègue, O Bellenguez-Morineau, D Prot MOSIM 2014, 10ème Conférence Francophone de Modélisation, Optimisation et …, 2014 | 4 | 2014 |
Complexity of a one-to-one meeting scheduling problem with two types of actors A Le Roux, O Bellenguez-Morineau, C Guéret, D Prot Journal of the Operational Research Society, 2015 | 3 | 2015 |
Ordonnancement de personnel avec affectation de tâches: un modèle mathématique T Lapègue, D Prot, O Bellenguez-Morineau Roadef 2013, 2013 | 3 | 2013 |
Lower bounds for a Fixed Job Scheduling Problem with an equity objective function D Prot, T Lapègue, O Bellenguez-Morineau 25th EURO Conference, 2012, 2012 | 2 | 2012 |
A note on the paper “Minimizing total tardiness on parallel machines with preemptions” by Kravchenko and Werner (2012) D Prot, O Bellenguez-Morineau, C Lahlou Journal of Scheduling 16 (4), 437-438, 2013 | 1 | 2013 |
Complexité de problèmes d'ordonnancement de rencontres de type speed-dating A Le Roux, O Bellenguez-Morineau, C Guéret, D Prot Roadef 2012, 2012 | 1 | 2012 |
Un nouveau système de trafic aérien à taux de conflits potentiels et consommation énergétique réduits D Prot | 1 | 2009 |
Une approche robuste pour la minimisation des risques de conflits aériens D Prot, C Rapine, S Constans, R Fondacci Roadef 2007, 2007 | 1 | 2007 |
A large neighborhood search for the Shift Design Personnel Task Scheduling Problem with Equity T Lapègue, D Prot, O Bellenguez-Morineau 6th Multidisciplinary International Conference on Scheduling: Theory and …, 0 | 1* | |