Availability allocation through importance measures J Barabady, U Kumar International journal of quality & reliability management 24 (6), 643-657, 2007 | 138 | 2007 |
Maintenance analytics–the new know in maintenance R Karim, J Westerberg, D Galar, U Kumar IFAC-PapersOnLine 49 (28), 214-219, 2016 | 136 | 2016 |
Reliability and Six Sigma Management UD Kumar, J Crocker, T Chitra, H Saranga Reliability and Six Sigma, 329-364, 2006 | 130 | 2006 |
Spares provisioning under performance-based logistics contract: profit-centric approach D Nowicki, UD Kumar, HJ Steudel, D Verma Journal of the Operational Research Society 59 (3), 342-352, 2008 | 129 | 2008 |
Age-related maintenance versus reliability centred maintenance: a case study on aero-engines J Crocker, UD Kumar Reliability Engineering & System Safety 67 (2), 113-118, 2000 | 129 | 2000 |
Optimization of aircraft maintenance/support infrastructure using genetic algorithms—level of repair analysis H Saranga, UD Kumar Annals of Operations Research 143, 91-106, 2006 | 126 | 2006 |
On aircraft scheduled maintenance program development A Ahmadi, P Söderholm, U Kumar Journal of Quality in Maintenance Engineering 16 (3), 229-255, 2010 | 117 | 2010 |
Reliability analysis of drum shearer machine at mechanized longwall mines S Hadi Hoseinie, M Ataei, R Khalokakaie, B Ghodrati, U Kumar Journal of quality in maintenance engineering 18 (1), 98-119, 2012 | 109 | 2012 |
Reliability analysis of power transmission cables of electric mine loaders using the proportional hazards model D Kumar, B Klefsjö, U Kumar Reliability Engineering & System Safety 37 (3), 217-222, 1992 | 107 | 1992 |
R&M and risk-analysis tools in product design, to reduce life-cycle cost and improve attractiveness T Markeset, U Kumar Annual Reliability and Maintainability Symposium. 2001 Proceedings …, 2001 | 102 | 2001 |
Maintenance costs and life cycle cost analysis D Galar, P Sandborn, U Kumar CRC Press, 2017 | 101 | 2017 |
Maintenance free operating period–an alternative measure to MTBF and failure rate for specifying reliability? UD Kumar, J Knezevic, J Crocker Reliability Engineering & System Safety 64 (1), 127-131, 1999 | 101 | 1999 |
Selection of maintenance strategy for aircraft systems using multi-criteria decision making methodologies A Ahmadi, S Gupta, R Karim, U Kumar International Journal of Reliability, Quality and Safety Engineering 17 (03 …, 2010 | 95 | 2010 |
Maintenance of machinery: Negotiating service contracts in business‐to‐business marketing R Kumar, T Markeset, U Kumar International Journal of Service Industry Management 15 (4), 400-413, 2004 | 95 | 2004 |
Integration of RAMS and risk analysis in product design and development work processes: A case study T Markeset, U Kumar Journal of Quality in Maintenance Engineering 9 (4), 393-410, 2003 | 92 | 2003 |
Operating environment-based spare parts forecasting and logistics: a case study B Ghodrati, U Kumar International Journal of Logistics: Research and Applications 8 (2), 95-105, 2005 | 89 | 2005 |
Availability based spare optimization using renewal process UD Kumar, J Knezevic Reliability Engineering & System Safety 59 (2), 217-223, 1998 | 87 | 1998 |
Holistic procedure for rail maintenance in Sweden S Kumar, U Espling, U Kumar Proceedings of the Institution of Mechanical Engineers, Part F: Journal of …, 2008 | 85 | 2008 |
An analytical hierarchy process (AHP)-guided decision model for underground mining method selection S Gupta, U Kumar International journal of mining, reclamation and environment 26 (4), 324-336, 2012 | 82 | 2012 |
Reliability analysis of load-haul-dump machines U Kumar Luleå tekniska universitet, 1990 | 80 | 1990 |