Obserwuj
Bertrand M.T. Lin 林妙聰
Bertrand M.T. Lin 林妙聰
Inne imiona/nazwiskaB.M.T. Lin, Bertrand M.T. Lin
National Yang Ming Chiao Tung University
Zweryfikowany adres z nycu.edu.tw - Strona główna
Tytuł
Cytowane przez
Cytowane przez
Rok
A concise survey of scheduling with time-dependent processing times
TCE Cheng, Q Ding, BMT Lin
European Journal of Operational Research 152 (1), 1-13, 2004
7612004
Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem
CY Lee, TCE Cheng, BMT Lin
Management Science 39 (5), 616-625, 1993
4381993
Application of ant colony optimization for no-wait flowshop scheduling problem to minimize the total completion time
SJ Shyu, BMT Lin, PY Yin
Computers & industrial engineering 47 (2-3), 181-193, 2004
1852004
Parallel-machine scheduling to minimize tardiness penalty and power cost
KT Fang, BMT Lin
Computers & Industrial Engineering 64 (1), 224-234, 2013
1672013
An ant colony optimization algorithm for the minimum weight vertex cover problem
SJ Shyu, PY Yin, BMT Lin
Annals of Operations Research 131, 283-304, 2004
1362004
An empirical investigation of total quality management: a Taiwanese case
YS Huang, BMT Lin
The TQM magazine 14 (3), 172-180, 2002
842002
A decision model for human resource allocation in project management of software development
HY Chiang, BMT Lin
IEEE Access 8, 38073-38081, 2020
702020
Makespan minimization in the two‐machine flowshop batch scheduling problem
TCE Cheng, BMT Lin, A Toker
Naval Research Logistics (NRL) 47 (2), 128-144, 2000
702000
On the development of a computer-assisted testing system with genetic test sheet-generating approach
GJ Hwang, BMT Lin, HH Tseng, TL Lin
IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and …, 2005
672005
Ant colony optimization for the cell assignment problem in PCS networks
SJ Shyu, BMT Lin, TS Hsiao
Computers & Operations Research 33 (6), 1713-1740, 2006
632006
Parallel-machine batch scheduling to minimize the maximum lateness and the number of tardy jobs
BMT Lin, AAK Jeng
International Journal of Production Economics 91 (2), 121-134, 2004
612004
Scheduling in an assembly-type production chain with batch transfer
BMT Lin, TCE Cheng, ASC Chou
Omega 35 (2), 143-151, 2007
592007
Parallel-machine batching and scheduling to minimize total completion time
TCE Cheng, ZL Chen, MY Kovalyov, BMT Lin
IIE transactions 28 (11), 953-956, 1996
591996
Development of new features of ant colony optimization for flowshop scheduling
BMT Lin, CY Lu, SJ Shyu, CY Tsai
International Journal of Production Economics 112 (2), 742-755, 2008
582008
An effective approach for test-sheet composition with large-scale item banks
GJ Hwang, BMT Lin, TL Lin
Computers & Education 46 (2), 122-139, 2006
572006
Batch scheduling in the no-wait two-machine flowshop to minimize the makespan
BMT Lin, TCE Cheng
Computers & Operations Research 28 (7), 613-624, 2001
562001
Two-stage flowshop scheduling with a common second-stage machine
C Oǧuz, BMT Lin, TCE Cheng
Computers & operations research 24 (12), 1169-1174, 1997
541997
Optimal scheduling in film production to minimize talent hold cost
TCE Cheng, JE Diamond, BMT Lin
Journal of Optimization Theory and Applications 79 (3), 479-492, 1993
531993
Customer order scheduling to minimize the number of late jobs
BMT Lin, AV Kononov
European Journal of Operational Research 183 (2), 944-948, 2007
512007
Complexity results for single-machine scheduling with positional learning effects
BMT Lin
Journal of the Operational Research Society 58 (8), 1099-1102, 2007
502007
Nie można teraz wykonać tej operacji. Spróbuj ponownie później.
Prace 1–20