Obserwuj
Tze Shwan Lim
Tze Shwan Lim
Zweryfikowany adres z taylors.edu.my
Tytuł
Cytowane przez
Cytowane przez
Rok
Evaluating housing needs and preferences of generation Y in Malaysia
KJ Kam, ASH Lim, KM Al-Obaidi, TS Lim
Planning Practice & Research 33 (2), 172-185, 2018
552018
Modelling of property market: The structural and locational attributes towards Malaysian properties
KJ Kam, SY Chuah, TS Lim, F Lin Ang
Pacific Rim Property Research Journal 22 (3), 203-216, 2016
202016
Purchasing decision of property buyers: the housing quality, financial capabilities, and government policies studies
JK Kenn, SL Tze, DPY Li, LA Fuey, TL Boon
Planning Malaysia 19, 2021
72021
SUSTAINABLE CONSTRUCTION WASTE MANAGEMENT PRACTICES IN MALAYSIAN CONSTRUCTION INDUSTRY; THE KUALA LUMPUR FEDERAL TERRITORY CONTEXT
KJ Kam, TS Lim, KKW Tan, LT Soon, B Tik
MALAYSIAN CONSTRUCTION RESEARCH JOURNAL (MCRJ), 104, 2019
22019
Virtual Reality (VR) Technology in Construction Education: Workflow, Constraints, and Strategies
LT Soon, KK Chow, HC Tan, MA Kamarazaly, TS Lim
Handbook of Research on Inclusive and Innovative Architecture and the Built …, 2023
12023
A Study on the Adoption of Smart Home Technologies Among the Homeowners in Malaysia
KJ Kam, LJ Wei, TS Lim, HS Ilmi, LT Soon
Handbook of Research on Inclusive and Innovative Architecture and the Built …, 2023
12023
IMPLEMENTATION OF ZERO WASTE CONCEPT IN MALAYSIA: FROM CONTRACTORS’PERSPECTIVE
HS Ilmi, JW Yee, KJ Kam, TS Lim, LT Soon
PLANNING MALAYSIA 22, 2024
2024
The Implementation of BIM Software in Different Construction Stages
TS Lim, ZY Low, LT Soon, HS Ilmi, KJ Kam, MA Kamarazaly
Insights on Resiliency and Urban Development, 269-288, 2024
2024
Educational Dynamics in Urban Study: Unraveling Student Preferences and Expectations in BQS Study
KJ Kam, WV Tan, TS Lim, LT Soon, CAL Shirley
Insights on Resiliency and Urban Development, 201-220, 2024
2024
Integration of Building Information Modelling (BIM) Into the Construction Project Scheduling
LT Soon, JYX Liew, TS Lim, KJ Kam, BT Leong
Insights on Resiliency and Urban Development, 185-200, 2024
2024
A Study on the Adoption of Smart Home Technologies Among the Homeowners in Malaysia Kenn Jhun Kam iD https://orcid. org/0000-0003-4927-4611
LJ Wei, TS Lim, HS Ilmi, LT Soon
Handbook of Research on Inclusive and Innovative Architecture and the Built …, 2023
2023
The Adoption and Challenges of Using Green Materials in Building Construction Projects
TS Lim, YL Lee, YX Goh, KJ Kam, LT Soon
Handbook of Research on Inclusive and Innovative Architecture and the Built …, 2023
2023
A Study on Building Inspection and Building Defect Rectification From the Contractors' and House Buyers' Sentiments
KJ Kam, XJ Lim, TS Lim, LT Soon
Handbook of Research on Inclusive and Innovative Architecture and the Built …, 2023
2023
The Strategies of 3D Modelling in the QS Profession
LT Soon, HS Goh, TS Lim, BT Leong, WT Hong, KJ Kam
Handbook of Research on Inclusive and Innovative Architecture and the Built …, 2023
2023
Building Performance Comparative Study: The Indoor Environment Quality and Energy Efficiency–Green Building vs. Conventional Building
TS Lim, KJ Kam, CK Wong, LT Soon, MA Kamarazaly
Handbook of Research on Issues, Challenges, and Opportunities in Sustainable …, 2022
2022
Survival Strategies and Challenges Faced by Subcontractors in Malaysian Construction Industry
KJ Kam, TS Lim, LH Lee, LT Soon, BT Leong, MA Kamarazaly
Malaysian Construction Research Journal 15 (Special issue 1), 22-37, 2022
2022
The Influence of External Spaces Building Performance Towards Learners' Thermal Comfort in Taylor's University's Lakeside Campus
KJ Kam, TS Lim, EH Tan, LT Soon, MA Kamarazaly
Handbook of Research on Issues, Challenges, and Opportunities in Sustainable …, 2022
2022
APPLICATION OF BUILDING INFORMATION MODELLING (BIM) IN QUANTITY SURVEYING (QS) EDUCATION: THE FLAWS AND WAY FORWARD
KJ KAM, SS LIEW, M AISHAH, HBSI AMARAZALY, TZES LIM
A Study on Housing Satisfaction and Renovation Decision in Klang Valley
KJ Kam, MC Sek, BT Leong, LT Soon, TS Lim
AERODYNAMIC TRAIN FORCE EFFECT TOWARDS THE LINESIDE EQUIPMENT IN THE UNDERGROUND STATION
KJ Kam, BT Leong, LT Soon, TS Lim
Nie można teraz wykonać tej operacji. Spróbuj ponownie później.
Prace 1–20