Obserwuj
Hugo David Nogueira Raposo
Hugo David Nogueira Raposo
Centre for Mechanical Engineering, Materials and Processes - CEMMPRE; Instituto Superior de
Zweryfikowany adres z isec.pt
Tytuł
Cytowane przez
Cytowane przez
Rok
Predicting condition based on oil analysis–A case study
H Raposo, JT Farinha, I Fonseca, D Galar
Tribology International 135, 65-74, 2019
632019
Condition monitoring with prediction based on diesel engine oil analysis: A case study for urban buses
H Raposo, JT Farinha, I Fonseca, LA Ferreira
Actuators 8 (1), 14, 2019
622019
Optimizing the life cycle of physical assets—a review
E Pais, JT Farinha, AJM Cardoso, H Raposo
WSEAS Trans. Syst. Control 15, 417-430, 2020
302020
Optimizing the life cycle of physical assets through an integrated life cycle assessment method
JE de Almeida Pais, HDN Raposo, JT Farinha, AJM Cardoso, ...
Energies 14 (19), 6128, 2021
212021
Dimensioning reserve bus fleet using life cycle cost models and condition based/predictive maintenance: a case study
H Raposo, JT Farinha, L Ferreira, D Galar
Public Transport 10, 169-190, 2018
202018
Augmented reality and the future of maintenance
R Oliveira, T Farinha, H Raposo, N Pires
Parte: Colecao: http://hdl. handle. net/10316.2/33309, 2014
202014
An integrated econometric model for bus replacement and determination of reserve fleet size based on predictive maintenance
H RAposo, JT FARinHA, L FeRReiRA, D Galar
Eksploatacja i Niezawodność 19 (3), 358-368, 2017
172017
ISO 55001–A Strategic Tool for the Circular Economy–Diagnosis of the Organization’s State
E Pais, H Raposo, A Meireles, JT Farinha
Journal of Industrial Engineering and Management Science 1, 89-108, 2019
162019
An integrated model for dimensioning the reserve fleet based on the maintenance policy
H Raposo, JT Farinha, E Pais, D Galar
WSEAS Trans. Syst. Control 16, 43-65, 2021
122021
Increasing the reliability of an electrical power system in a big european hospital through the petri nets and fuzzy inference system mamdani modelling
CA Pinto, JT Farinha, S Singh, H Raposo
Applied Sciences 11 (6), 2604, 2021
102021
Time replacement optimization models for urban transportation buses with indexation to fleet reserve
H Raposo, JT Farinha, R Oliveira, LA Ferreira, J André
Colecao: http://hdl. handle. net/10316.2/33309, 2014
102014
Economic life cycle of the bus fleet: a case study
H Raposo, JT Farinha, L Ferreira, F Didelet
International Journal of Heavy Vehicle Systems 26 (1), 31-54, 2019
92019
Análise de Investimento versus Análise do Ciclo de Vida no Contexto das ISO 55000 com ênfase na Gestão de Manutenção
H Raposo, A Meireles, E Pais, JT Farinha
º Congresso Nacional de Manutenção. Maia, Portugal, 2017
82017
An integrated econometric model for bus replacement and spare reserve based on a condition predictive maintenance model
H Raposo, JT Farinha, L Ferreira, D Galar
Maintenance and Reliability. Eksploatacja i Niezawodnosc-Maintenance and …, 2017
82017
Stochastic versus Fuzzy Models—A Discussion Centered on the Reliability of an Electrical Power Supply System in a Large European Hospital
CA Pinto, JT Farinha, H Raposo, D Galar
Energies 15 (3), 1024, 2022
72022
CMMS–An integrated view from maintenance management to on-line condition monitoring
JT Farinha, I Fonseca, R Oliveira, H Raposo
Colecao: http://hdl. handle. net/10316.2/33309, 2014
72014
The economic management of physical assets: The practical case of an Urban Passenger Transport Company in Portugal
C Mendes, H Raposo, R Ferraz, JT Farinha
Sustainability 15 (15), 11492, 2023
62023
Economic Life Cycle versus Lifespan–A Case Study of an Urban Bus Fleet
H Raposo, JT Farinha, I Fonseca, D Galar
Engineering and Applied Sciences 4 (2), 30-43, 2019
62019
Dimensioning Reserve Bus Fleet using Life Cycle Cost Models and Condition Based/Predictive Maintenance-a Case Study. Public Transport. Volume 10 Number 1
H Raposo, JT Farinha, L Ferreira, D Galar
Springer Berlin Heidelberg, 2017
62017
Reserve fleet indexed to exogenous cost variables
HDN Raposo, JMT Farinha, LA Ferreira, D Galar
Transport 34 (4), 437-454, 2019
52019
Nie można teraz wykonać tej operacji. Spróbuj ponownie później.
Prace 1–20