Artificial neural network models for predicting condition of offshore oil and gas pipelines MS El-Abbasy, A Senouci, T Zayed, F Mirahadi, L Parvizsedghy Automation in Construction 45, 50-65, 2014 | 251 | 2014 |
Condition prediction models for oil and gas pipelines using regression analysis MS El-Abbasy, A Senouci, T Zayed, F Mirahadi, L Parvizsedghy Journal of Construction Engineering and Management 140 (6), 04014013, 2014 | 56 | 2014 |
Condition-based maintenance decision support system for oil and gas pipelines L Parvizsedghy, A Senouci, T Zayed, SF Mirahadi, MS El-Abbasy Structure and Infrastructure Engineering 11 (10), 1323-1337, 2015 | 39 | 2015 |
Unpiggable oil and gas pipeline condition forecasting models MS El-Abbasy, A Senouci, T Zayed, L Parvizsedghy, F Mirahadi Journal of Performance of Constructed Facilities 30 (1), 04014202, 2016 | 36 | 2016 |
Consequence of failure: Neurofuzzy-based prediction model for gas pipelines L Parvizsedghy, T Zayed Journal of performance of constructed facilities 30 (4), 04015073, 2016 | 32 | 2016 |
Deterioration assessment models for water pipelines L Parvizsedghy, I Gkountis, A Senouci, T Zayed, M Alsharqawi, ... International Journal of Civil and Environmental Engineering 11 (7), 1013-1022, 2017 | 15 | 2017 |
Reliability assessment model for water distribution networks M Alsharqawi, T Zayed, L Parvizsedghy, A Senouci, H Al-Derham Journal of Pipeline Systems Engineering and Practice 11 (2), 04019059, 2020 | 13 | 2020 |
Developing failure age prediction model of hazardous liquid pipelines L Parvizsedghy, T Zayed | 7 | 2015 |
Predictive Risk-Based Model for Oil and Gas Pipelines L Parvizsedghy, L., Zayed Canadian Society of Civil Engineering 2013 Annual Conference, Montreal, Canada,, 2013 | 6 | 2013 |
Failure prediction model of oil and gas pipelines L Parvizsedghy, T Zayed Proc., 14th Int. Conf. on Civil, Structural and Environmental Engineering …, 2013 | 5 | 2013 |
International projects risk management in the construction industry L Parvizsedghy, MH Sobhiyah 2011 International Conference on Business Management and Electronic …, 2011 | 4 | 2011 |
Risk-Based Maintenance Planning Model for Oil and Gas Pipelines L Parvizsedghy Concordia University, 2015 | 3 | 2015 |
Probabilistic bow-tie model to predict failure probability of oil and gas pipelines L Parvizsedghy, T Zayed International Pipeline Conference 46117, V002T06A027, 2014 | 3 | 2014 |
Optimized maintenance plan for oil and gas pipelines MS El-Abbasy, T Zayed, F Mirahadi, L Parvizsedghy, A Senouci Canadian Journal of Civil Engineering 49 (7), 1151-1162, 2022 | 2 | 2022 |
Forecasting the failure consequences of oil pipelines L Parvizsedghy, T Zayed Civil-Comp Proceedings 106, 2014 | 2 | 2014 |
Forecasting the Failure Consequences of Oil Pipelines T Parvizsedghy, L., Zayed Twelfth International Conference on Computational Structures Technology …, 2014 | | 2014 |
Failure Prediction Model of Oil and Gas Pipelines T Parvizsedghy, L., Zayed The Fourteenth International Conference on Civil, Structural and …, 2013 | | 2013 |