Contractor selection model for highway projects using integrated simulation and analytic network process MS El-Abbasy, T Zayed, M Ahmed, H Alzraiee, M Abouhamad Journal of construction engineering and management 139 (7), 755-767, 2013 | 113 | 2013 |
Dynamic planning of construction activities using hybrid simulation H Alzraiee, T Zayed, O Moselhi Automation in Construction 49, 176-192, 2015 | 94 | 2015 |
Condition prediction for cured-in-place pipe rehabilitation of sewer mains I Bakry, H Alzraiee, ME Masry, K Kaddoura, T Zayed Journal of Performance of Constructed Facilities 30 (5), 04016016, 2016 | 40 | 2016 |
Detecting of pavement marking defects using faster R-CNN H Alzraiee, A Leal Ruiz, R Sprotte Journal of Performance of Constructed Facilities 35 (4), 04021035, 2021 | 39 | 2021 |
Condition prediction for chemical grouting rehabilitation of sewer networks I Bakry, H Alzraiee, K Kaddoura, M El Masry, T Zayed Journal of Performance of Constructed Facilities 30 (6), 04016042, 2016 | 39 | 2016 |
A hybrid framework for modeling construction operations using discrete event simulation and system dynamics H Alzraiee, O Moselhi, T Zayed Construction Research Congress 2012: Construction Challenges in a Flat World …, 2012 | 26 | 2012 |
Cost estimate system using structured query language in BIM H Alzraiee International Journal of Construction Management 22 (14), 2731-2743, 2022 | 25 | 2022 |
Destructive analysis-based testing for cured-in-place pipe H Alzraiee, I Bakry, T Zayed Journal of Performance of Constructed Facilities 29 (4), 04014095, 2015 | 19 | 2015 |
Quantitative analysis of construction labor acceptance of wearable sensing devices to enhance workers' safety H Fugate, H Alzraiee Results in Engineering 17, 100841, 2023 | 14 | 2023 |
Methodology for synchronizing discrete event simulation and system dynamics models H Alzraiee, T Zayed, O Moselhi Proceedings of the 2012 Winter Simulation Conference (WSC), 1-11, 2012 | 14 | 2012 |
Hybrid simulation for construction operations HSH Alzraiee Concordia University, 2013 | 11 | 2013 |
Assessment of construction operations productivity rate as computed by simulation models H Alzraiee, T Zayed, O Moselhi 2013 Winter Simulations Conference (WSC), 3225-3236, 2013 | 9 | 2013 |
A retrospective evaluation of cured-in-place pipe (CIPP) rehabilitation technique used in municipal sewers H Alzraiee, I Bakry, T Zayed No-Dig, 2013 | 8 | 2013 |
A retrospective evaluation of cured-in-place pipe (CIPP) rehabilitation technique used in municipal sewers T Alzraiee, H., Bakry, I., Zayed NASTT No Dig, 1-9, 2013 | 8* | 2013 |
Dynamic planning of earthmoving projects using system dynamics H Alzraiee, O Moselhi, T Zayed ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2012 | 7 | 2012 |
Case Study: Assessing the structural condition of steel bridges using Terrestrial Laser Scanner (TLS) L Psomas, R Trainor, H Alzraiee Construction Research Congress 2022, 433-442, 2022 | 6 | 2022 |
A framework for cost estimation using BIM object parameters MT Clark, HS Alzraiee Proceedings, Annual Conference-Canadian Society for Civil Engineering. Laval, 2019 | 5 | 2019 |
Integrating BIM and Earned Value Management System to Measure Construction Progress H Alzraiee Construction Research Congress 2018, 684-693, 2018 | 5 | 2018 |
Quality Control for Concrete Steel Embed Plates using LiDAR and Point Cloud Mapping H Alzraiee, R Sprotte, AL Ruiz ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2020 | 4 | 2020 |
Digital Safety Planning and Monitoring in Highway Construction Projects TH Goh, HS Alzraiee Construction Research Congress 2022, 307-313, 2022 | 3 | 2022 |