Obserwuj
Anil Sawhney, PhD, PMP FRICS FHEA
Anil Sawhney, PhD, PMP FRICS FHEA
RICS, New York, NY 10165
Zweryfikowany adres z rics.org - Strona główna
Tytuł
Cytowane przez
Cytowane przez
Rok
Analysing factors affecting delays in Indian construction projects
H Doloi, A Sawhney, KC Iyer, S Rentala
International Journal of Project Management, 2011
11332011
Structural equation model for assessing impacts of contractor's performance on project success
H Doloi, KC Iyer, A Sawhney
International journal of project management 29 (6), 687-695, 2011
4042011
Construction 4.0
A Sawhney, M Riley, J Irizarry, M Riley
Sawhney, A., Riley, M., Irizarry, J., Eds, 2020
3432020
Factors influencing BIM adoption in emerging markets–the case of India
R Ahuja, A Sawhney, M Jain, M Arif, S Rakshit
International Journal of Construction Management 20 (1), 65-76, 2020
1952020
Structural equation model for investigating factors affecting delay in Indian construction projects
H Doloi, A Sawhney, KC Iyer
Construction Management and Economics 30 (10), 869-884, 2012
1842012
Adoption of BIM by architectural firms in India: technology–organization–environment perspective
R Ahuja, M Jain, A Sawhney, M Arif
Architectural engineering and design management 12 (4), 311-330, 2016
1522016
Issues of construction health and safety in developing countries: a case of Jordan
S Zaid Alkilani, J Jupp, A Sawhney
Australasian Journal of Construction Economics and Building, The 13 (3), 141-156, 2013
1192013
Adaptive probabilistic neural network-based crane type selection system
A Sawhney, A Mund
Journal of construction engineering and management 128 (3), 265-273, 2002
1102002
Driving lean and green project outcomes using BIM: A qualitative comparative analysis
R Ahuja, A Sawhney, M Arif
International Journal of Sustainable Built Environment 6 (1), 69-80, 2017
982017
Relationship between skill development and productivity in construction sector: A literature review
S Dixit, SN Mandal, A Sawhney, S Singh
International Journal of Civil Engineering and Technology 8 (8), 649-665, 2017
972017
Internet based interactive construction management learning system
A Sawhney, J Marble, A Mund, A Vamadevan
Construction Congress VI: Building Together for a Better Tomorrow in an …, 2000
932000
Implications of even flow production methodology for US housing industry
HH Bashford, A Sawhney, KD Walsh, K Kot
Journal of construction engineering and management 129 (3), 330-337, 2003
922003
Environmental impacts over the life cycle of residential buildings using different exterior wall systems
R Kahhat, J Crittenden, F Sharif, E Fonseca, K Li, A Sawhney, P Zhang
Journal of Infrastructure Systems 15 (3), 211-221, 2009
902009
Agent-based modeling and simulation in construction
Sawhney, Bashford, Mulky
Proceedings of the 2003 Winter Simulation Conference, 2003. 2, 1541-1547 vol. 2, 2003
872003
Production system loading–cycle time relationship in residential construction
HH Bashford, KD Walsh, A Sawhney
Journal of Construction Engineering and Management 131 (1), 15-22, 2005
762005
HSM-Simulation–Based planning method for construction projects
A Sawhney, SM AbouRizk
Journal of construction engineering and management 121 (3), 297-303, 1995
751995
Area of linkage between lean construction and sustainability in Indian construction industry
S Dixit, SN Mandal, A Sawhney, S Singh
International Journal of Civil Engineering and Technology 8 (8), 2017
712017
Grand challenges for the Indian construction industry
A Sawhney, R Agnihotri, V Kumar Paul
Built Environment Project and Asset Management 4 (4), 317-334, 2014
702014
Construction project simulation using CYCLONE
A Sawhney, SM AbouRizk, DW Halpin
Canadian Journal of Civil Engineering 25 (1), 16-25, 1998
701998
State of BIM adoption and outlook in India
A Sawhney, A Kapoor, S Kamthan, N Agarwal, P Bhakre, S Jain
RICS School of Built Environment 1 (1), 1-30, 2014
672014
Nie można teraz wykonać tej operacji. Spróbuj ponownie później.
Prace 1–20