A survey on working vacation queueing models VM Chandrasekaran, K Indhira, MC Saravanarajan, P Rajadurai Int. J. Pure Appl. Math 106 (6), 33-41, 2016 | 92 | 2016 |
A study on M/G/1 feedback retrial queue with subject to server breakdown and repair under multiple working vacation policy P Rajadurai, MC Saravanarajan, VM Chandrasekaran Alexandria Engineering Journal 57 (2), 947-962, 2018 | 85 | 2018 |
Performance analysis of a single server retrial queue with working vacation D Arivudainambi, P Godhandaraman, P Rajadurai Opsearch 51, 434-462, 2014 | 73 | 2014 |
Analysis of M[X]/G/1 retrial queue with two phase service under Bernoulli vacation schedule and random breakdown P Rajadurai, M Varalakshmi, MC Saravanarajan, VM Chandrasekaran International journal of mathematics in operational research 7 (1), 19-41, 2015 | 48 | 2015 |
Analysis of an unreliable retrial G-queue with working vacations and vacation interruption under Bernoulli schedule P Rajadurai, VM Chandrasekaran, MC Saravanarajan Ain Shams Engineering Journal 9 (4), 567-580, 2018 | 46 | 2018 |
Analysis of an M[X]/G/1 unreliable retrial G-queue with orbital search and feedback under Bernoulli vacation schedule P Rajadurai, VM Chandrasekaran, MC Saravanarajan Opsearch 53, 197-223, 2016 | 46 | 2016 |
Analysis of an M [X]/(G1, G2)/1 retrial queueing system with balking, optional re-service under modified vacation policy and service interruption P Rajadurai, MC Saravanarajan, VM Chandrasekaran Ain Shams Engineering Journal 5 (3), 935-950, 2014 | 43 | 2014 |
Performance analysis of preemptive priority retrial queueing system with disaster under working breakdown services SI Ammar, P Rajadurai Symmetry 11 (3), 419, 2019 | 39 | 2019 |
Sensitivity analysis of an M/G/1 retrial queueing system with disaster under working vacations and working breakdowns P Rajadurai RAIRO-Operations Research 52 (1), 35-54, 2018 | 33 | 2018 |
Steady state analysis of batch arrival feedback retrial queue with two phases of service, negative customers, Bernoulli vacation and server breakdown P Rajadurai, VM Chandrasekaran, MC Saravanarajan International journal of mathematics in operational research 7 (5), 519-546, 2015 | 30 | 2015 |
Nonlinear mixed thermal convective flow over a rotating disk in suspension of magnesium oxide nanoparticles with water and EG CSK Raju, SU Mamatha, P Rajadurai, I Khan The European Physical Journal Plus 134 (5), 196, 2019 | 24 | 2019 |
Performance analysis of an M/G/1 retrial G-queue with feedback under working breakdown services. P Rajadurai, M Sundararaman, D Narasimhan Songklanakarin Journal of Science & Technology 42 (1), 2020 | 20 | 2020 |
Performance analysis of preemptive priority retrial queue with immediate Bernoulli feedback under working vacations and vacation interruption. P Rajadurai, S Yuvarani, MC Saravanarajan Songklanakarin Journal of Science & Technology 38 (5), 2016 | 20 | 2016 |
An M/G/1 retrial queueing system with two phases of service, immediate Bernoulli feedbacks, single vacation and starting failures M Varalakshmi, P Rajadurai, MC Saravanarajan, VM Chandrasekaran International Journal of Mathematics in Operational Research 9 (3), 302-328, 2016 | 19 | 2016 |
A study on M/G/1 preemptive priority retrial queue with Bernoulli working vacations and vacation interruption P Rajadurai International Journal of Process Management and Benchmarking 9 (2), 193-215, 2019 | 18 | 2019 |
An M/G/1 retrial G-queue with optional re-service, impatient customers, multiple working vacations and vacation interruption P Rajadurai, MC Saravanarajan, VM Chandrasekaran International Journal of Operational Research 30 (1), 33-64, 2017 | 18 | 2017 |
Mathematical modelling and performance analysis of single server queuing system-eigenspectrum E Mamatha, S Saritha, CS Reddy, P Rajadurai International Journal of Mathematics in Operational Research 16 (4), 455-468, 2020 | 17 | 2020 |
Cost optimisation analysis of retrial queue with K optional phases of service under multiple working vacations and random breakdowns P Rajadurai, MC Saravanarajan, VM Chandrasekaran International Journal of Industrial and Systems Engineering 29 (2), 193-222, 2018 | 17 | 2018 |
A study on M/G/1 retrial queueing system with three different types of customers under working vacation policy P Rajadurai International Journal of Mathematical Modelling and Numerical Optimisation 8 …, 2018 | 14 | 2018 |
A model for overflow queuing network with two-station heterogeneous system S Saritha, E Mamatha, CS Reddy, P Rajadurai International Journal of Process Management and Benchmarking 12 (2), 147-158, 2022 | 13 | 2022 |