A Pareto improved artificial fish swarm algorithm for solving a multi-objective fuzzy disassembly line balancing problem Z Zhang, K Wang, L Zhu, Y Wang Expert Systems with Applications 86, 165-176, 2017 | 190 | 2017 |
A multi-action deep reinforcement learning framework for flexible Job-shop scheduling problem K Lei, P Guo, W Zhao, Y Wang, L Qian, X Meng, L Tang Expert Systems with Applications 205, 117796, 2022 | 167 | 2022 |
A Pareto firefly algorithm for multi-objective disassembly line balancing problems with hazard evaluation L Zhu, Z Zhang, Y Wang International Journal of Production Research 56 (24), 7354-7374, 2018 | 107 | 2018 |
An implementation of fast wavelet Galerkin methods for integral equations of the second kind W Fang, Y Wang, Y Xu Journal of Scientific Computing 20 (2), 277-302, 2004 | 92 | 2004 |
Hybrid evolutionary algorithm with extreme machine learning fitness function evaluation for two-stage capacitated facility location problems P Guo, W Cheng, Y Wang Expert Systems with Applications 71, 57-68, 2017 | 82 | 2017 |
Large-Scale Dynamic Scheduling for Flexible Job-Shop With Random Arrivals of New Jobs by Hierarchical Reinforcement Learning K Lei, P Guo, Y Wang, J Zhang, X Meng, L Qian IEEE Transactions on Industrial Informatics, 2023 | 65 | 2023 |
Solve routing problems with a residual edge-graph attention neural network K Lei, P Guo, Y Wang, X Wu, W Zhao Neurocomputing 508, 79-98, 2022 | 58 | 2022 |
Parallel machine scheduling with step deteriorating jobs and setup times by a hybrid discrete cuckoo search algorithm P Guo, W Cheng, Y Wang Engineering Optimization 47, 1564-1585, 2015 | 58 | 2015 |
On the end-of-life state oriented multi-objective disassembly line balancing problem L Zhu, Z Zhang, Y Wang, N Cai Journal of Intelligent Manufacturing 31, 1403-1428, 2020 | 54 | 2020 |
Gantry crane scheduling in intermodal rail-road container terminals P Guo, W Cheng, Y Wang, N Boysen International Journal of Production Research 56 (16), 5419-5436, 2018 | 48 | 2018 |
A modified generalized extremal optimization algorithm for the quay crane scheduling problem with interference constraints P Guo, W Chen, Y Wang Engineering Optimization 46, 1411-1429, 2014 | 38 | 2014 |
A general variable neighborhood search for single-machine total tardiness scheduling problem with step-deteriorating jobs P Guo, W Chen, Y Wang J. Industrial and Management Optimization 10 (4), 1071-1090, 2014 | 36 | 2014 |
Multi-agent deep reinforcement learning for task offloading in group distributed manufacturing systems J Xiong, P Guo, Y Wang, X Meng, J Zhang, L Qian, Z Yu Engineering Applications of Artificial Intelligence 118, 105710, 2023 | 29 | 2023 |
An improved scatter search algorithm for the corridor allocation problem considering corridor width Z Zhang, L Mao, C Guan, L Zhu, Y Wang Soft Computing 24 (1), 461-481, 2020 | 27 | 2020 |
A fast wavelet collocation method for integral equations on polygons Y Wang, Y Xu The Journal of Integral Equations and Applications, 277-330, 2005 | 25 | 2005 |
A sampling theorem for non-bandlimited signals using generalized Sinc functions Q Chen, Y Wang, Y Wang Computers & Mathematics with Applications 56 (6), 1650-1661, 2008 | 24 | 2008 |
Logic-based Benders decomposition for gantry crane scheduling with transferring position constraints in a rail–road container terminal P Guo, X He, Y Luan, Y Wang Engineering Optimization, 1-21, 2020 | 19 | 2020 |
An End-to-end Hierarchical Reinforcement Learning Framework for Large-scale Dynamic Flexible Job-shop Scheduling Problem K Lei, P Guo, Y Wang, J Xiong, W Zhao 2022 International Joint Conference on Neural Networks (IJCNN), 1-8, 2022 | 16 | 2022 |
On Crevecoeur’s bathtub-shaped failure rate model J Liu, Y Wang Computational Statistics & Data Analysis 57 (1), 645-660, 2013 | 13 | 2013 |
Amplitudes of mono-component signals and the generalized sampling functions Q Chen, L Li, Y Wang Signal Processing 94, 255-263, 2014 | 11 | 2014 |