The changepoint model for statistical process control DM Hawkins, P Qiu, CW Kang Journal of quality technology 35 (4), 355-366, 2003 | 518 | 2003 |
Analysing the organizational factors of project complexity using structural equation modelling SM Qureshi, CW Kang International journal of project management 33 (1), 165-176, 2015 | 298 | 2015 |
A control chart for the coefficient of variation CW Kang, MS Lee, YJ Seong, DM Hawkins Journal of quality technology 39 (2), 151-158, 2007 | 204 | 2007 |
A practical approach to project scheduling: considering the potential quality loss cost in the time–cost tradeoff problem JY Kim, CW Kang, IK Hwang International Journal of Project Management 30 (2), 264-272, 2012 | 198 | 2012 |
Development of CV control chart using EWMA technique EP Hong, CW Kang, JW Baek, HW Kang Journal of Korean Society of Industrial and Systems Engineering 31 (4), 114-120, 2008 | 99 | 2008 |
Cell formation in a cellular manufacturing system using simulation integrated hybrid genetic algorithm M Imran, C Kang, YH Lee, M Jahanzaib, H Aziz Computers & Industrial Engineering 105, 123-135, 2017 | 94 | 2017 |
Current trends analysis and prioritization of success factors: a systematic literature review of ICT projects M Ayat, M Imran, A Ullah, CW Kang International journal of managing projects in business 14 (3), 652-679, 2021 | 82 | 2021 |
Improving project budget estimation accuracy and precision by analyzing reserves for both identified and unidentified risks H Kwon, CW Kang Project Management Journal 50 (1), 86-100, 2019 | 77 | 2019 |
Effect of inspection performance in smart manufacturing system based on human quality control system CW Kang, MB Ramzan, B Sarkar, M Imran The International Journal of Advanced Manufacturing Technology 94, 4351-4364, 2018 | 77 | 2018 |
Medicine supply chain model for an integrated healthcare system with uncertain product complaints M Imran, C Kang, MB Ramzan Journal of manufacturing systems 46, 13-28, 2018 | 72 | 2018 |
Effects of the COVID-19 pandemic on the construction sector: A systemized review M Ayat, CW Kang Engineering, construction and architectural management 30 (2), 734-754, 2023 | 71 | 2023 |
Impact of random defective rate on lot size focusing work-in-process inventory in manufacturing system CW Kang, M Ullah, B Sarkar, I Hussain, R Akhtar International Journal of Production Research 55 (6), 1748-1766, 2017 | 50 | 2017 |
An analysis of the M/G/1 system with N and T policy S Hur, J Kim, C Kang Applied Mathematical Modelling 27 (8), 665-675, 2003 | 49 | 2003 |
Degradation analysis of nano-contamination in plasma display panels SJ Bae, SJ Kim, MS Kim, BJ Lee, CW Kang IEEE Transactions on Reliability 57 (2), 222-229, 2008 | 47 | 2008 |
Optimum ordering policy for an imperfect single-stage manufacturing system with safety stock and planned backorder CW Kang, M Ullah, B Sarkar The International Journal of Advanced Manufacturing Technology 95, 109-120, 2018 | 35 | 2018 |
Stochastic-petri net modeling and optimization for outdoor patients in building sustainable healthcare system considering staff absenteeism CW Kang, M Imran, M Omair, W Ahmed, M Ullah, B Sarkar Mathematics 7 (6), 499, 2019 | 34 | 2019 |
Effect of rework, rejects and inspection on lot size with work-in-process inventory M Ullah, CW Kang International Journal of Production Research 52 (8), 2448-2460, 2014 | 32 | 2014 |
Application of artificial neural network to identify non-random variation patterns on the run chart in automotive assembly process KY Jang, K Yang, C Kang International Journal of Production Research 41 (6), 1239-1254, 2003 | 32 | 2003 |
A single-stage manufacturing model with imperfect items, inspections, rework, and planned backorders C Wook Kang, M Ullah, M Sarkar, M Omair, B Sarkar Mathematics 7 (5), 446, 2019 | 23 | 2019 |
Impact of the Coronavirus disease 2019 and the post-pandemic construction sector (Pakistan) M Ayat, A Ullah, CW Kang International Journal of Managing Projects in Business 15 (4), 659-675, 2021 | 21 | 2021 |