Urmăriți
Hugo Hissashi Miyata
Hugo Hissashi Miyata
Doutorando em Engenharia de Produção, Universidade de São Paulo
Adresă de e-mail confirmată pe usp.br
Titlu
Citat de
Citat de
Anul
The blocking flow shop scheduling problem: A comprehensive and conceptual review
HH Miyata, MS Nagano
Expert Systems with Applications 137, 130-156, 2019
732019
Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization
HH Miyata, MS Nagano, JND Gupta
Computers & Industrial Engineering 135, 79-104, 2019
642019
A constructive heuristic for total flowtime minimization in a no-wait flowshop with sequence-dependent setup times
MS Nagano, HH Miyata, DC Araújo
Journal of Manufacturing Systems 36, 224-230, 2015
532015
An iterated greedy algorithm for distributed blocking flow shop with setup times and maintenance operations to minimize makespan
HH Miyata, MS Nagano
Computers & Industrial Engineering 171, 108366, 2022
322022
Review and classification of constructive heuristics mechanisms for no-wait flow shop problem
MS Nagano, HH Miyata
The International Journal of Advanced Manufacturing Technology 86, 2161-2174, 2016
322016
An evolutionary clustering search for the total tardiness blocking flow shop problem
MS Nagano, AS Komesu, HH Miyata
Journal of Intelligent Manufacturing 30, 1843-1857, 2019
312019
Optimizing distributed no-wait flow shop scheduling problem with setup times and maintenance operations via iterated greedy algorithm
HH Miyata, MS Nagano
Journal of manufacturing Systems 61, 592-612, 2021
272021
Procedure structuring for programming aircraft maintenance activities
VSV Junqueira, MS Nagano, HH Miyata
Revista de Gestão 27 (1), 2-20, 2020
252020
Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study
HH Miyata, MS Nagano, JND Gupta
Engineering Optimization 51 (4), 680-698, 2019
252019
An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time
MS Nagano, FS de Almeida, HH Miyata
Engineering Optimization 53 (8), 1431-1449, 2021
222021
Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance
TT Yamada, MS Nagano, HH Miyata
International Journal of Industrial Engineering Computations 12, 415-426, 2021
112021
Scheduling in flow shop with sequence-dependent setup times: literature review and analysis
MG Filho, M de Fátima Morais, TJP Boiko, HH Miyata, FWR Varolo
International Journal of Business Innovation and Research 7 (4), 466-486, 2013
72013
A high quality solution constructive heuristic for no-wait flow shop scheduling problem
MS Nagano, HH Miyata
Industrial Engineering & Management Systems 15 (3), 206-214, 2016
62016
Solutions methods for m-machine blocking flow shop with setup times and preventive maintenance costs to minimise hierarchical objective-function
HH Miyata, MS Nagano, JND Gupta
International Journal of Production Research 61 (19), 6308-6335, 2023
52023
BALANCEAMENTO DE LINHA NO SETOR DE CORTES DE INTEIROS DE UM FRIGORÍFICO DE AVES LOCALIZADO NO OESTE DO PARANÁ
HH MIYATA, TP BOIKO
Anais do XIX Simpósio de Engenharia de Produção. Bauru: SIMPEP, 2012
22012
Métodos heurísticos para minimização da duração total da programação em ambiente no-wait flow shop com políticas de manutenção-preventiva
HH Miyata
Universidade de São Paulo, 2015
12015
Relações do Trabalho no Japão
A Barreto, HH Miyata, AM Groff
Encontro de Engenharia de Produção Agroindustrial (IV EEPA), 2010
12010
A comprehensive analysis of sustainable fertilizer-related publications within the context of circular economy: insights from the field of business management
TK Kodama, MS Nagano, HH Miyata, AR Ometto, C Beal
Cleaner Production Letters, 100077, 2024
2024
Proposta de indicadores ambientais para obtenção da certificação ISO 14001 para empresas do agronegócio
JV Rodrigues, LM Enami, SL Cotrim, HH Miyata, BG de Souza
Revista Produção Online 23 (2), 4895-4895, 2023
2023
Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times
EAG Souza, MS Nagano, HH Miyata, LR Abreu
Journal of Project Management 8 (2), 99-118, 2023
2023
Sistemul nu poate realiza operația în acest moment. Încercați din nou mai târziu.
Articole 1–20